8195 Regnier, Amanda Leigh Phase II Archaeological Testing of Site 9FY166 for the Proposed Peachtree City Airport/Falcon Field Hangar Extension, Fayette County, Georgia

Between September 20 and October 5, 2006, Edwards-Pitman Environmental, Inc. (EPEI), under a contract with PBS&J Engineering, conducted Phase II archaeological testing at 9FY166 within the proposed Peachtree City Airport/Falcon Field Hangar Extension, Fayette County, Georgia.

Jefferson 2011
8196 Anderson, Joe, Beazley, Matthew TCNS ID 128242 Proposed 105-Foot Monopine Telecommunications Structure (110-Foot Overall Height with Appurtenances)

Executive Summary

McDuffie 2011
8197 Honerkamp, Nicholas, Gilligan, Meredith Past and Present Landscapes at the North End Site (9CH1062), Ossabaw Island, Georgia

During May and June of 2011 and 2012, the University of Tennessee at Chattanooga (UTC) undertook an archaeological survey and limited testing at the North End site (9CH1062) on Ossabaw Island, Georgia (Figure 1).

McDuffie 2013
8198 Quirk, Phillip W. Phase I Archaeological Survey of the Proposed I-85 at SR 74/Senoia Road Interchange Reconstruction and Widening Project, Fulton County, Georgia

Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for reconstruction and widening of the interchange of Interstate (I-) 85 at State Route (SR) 74/Senoia Road in Fulton County, Georgia (Georgia Department of Transportation [GDOT] P.I. No. 0007841; HP No.

Taliaferro 2013
8199 Owens, Daphne L. Archaeological Survey for the SR 40 from CS 457/East St, Camden County

The project will include the removal of the existing old, broken, ageing, and non-ADA compliant sidewalks and construct 6,400 SF of 5 ft wide brick paver sidewalks with ADA compliant ramps on Georgia SR 40/West King Street.  The proposed construction will also include a 7.5 feet wide green s

Chatham 2012
8200 Roberts, Joseph Phase I Archaeological Survey for SR 16 at SR 54 Intersection Improvements, Coweta County, Georgia

In February 2014 and April 2015, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of State Route (SR) 16 at SR 54 in Coweta County, Georgia (Georgia Department of Transportation [GDOT] Project No. NH000-0022-01[023], P.I. No. 332180, HP No. 140113-003).

Appling 2013
8201 Pietak, Lynn Marie, Silliman, Garrett W. Phase I Archaeological Survey of the Proposed South Lake C-Tran Bus Transfer Facility Project Area, Clayton County, Georgia

In May 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed South Lake C-Tran Bus Transfer Facility project area.

Chatham 2013
8202 Mustonen, Heather Interchange Reconstruction - Interstate 75 at SR 27, Dooly County

The proposed project would replace the existing SR 27 bridge over 1-75 on new alignment with a 346-foot long by 71.25-foot wide structure. The proposed typical section of SR 27 would include two 12-foot travel lanes with 4-foot paved shoulders and 6-foot grass shoulders.

Dooly 2014
8203 Stokes, Anne V. Archaeological Investigations (Phase I Survey) to Support Proposed Solar Photovoltaic Project at Naval Submarine Base (SUBASE) Kings Bay, Camden County, Georgia

Between 12 and 30 January 2015, SEARCH conducted a Phase I archaeological survey of approximately 250 acres, plus a 7,150‐meter transmission line corridor, at Naval Submarine Base (SUBASE) Kings Bay, located in Camden County, Georgia (Figure 1.1).

Morgan 2013
8204 Blackwelder, Jon R. Addendum to the Archaeological Survey of the Proposed State Route 44 Improvements Project, Putnam and Greene Counties, Georgia

In March 2012, Edwards-Pitman Environmental, Inc. (EPEI) conducted an addendum to the Phase I archaeological survey of the proposed State Route (SR) 44 improvements project in Putnam County, Georgia (Georgia Department of Transportation [GDOT] Project Numbers CSSTP-0006-00[252] and [253], P.I.

Cherokee 2013