Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8795 Blackwelder, Jon R. Phase I Archaeological Survey of SR 369 Over the Chattahoochee River Bridge Replacement, Forsyth and Hall Counties, Georgia

The proposed project would consist of replacing the SR 369 Bridge over the Chattahoochee River (Lake Lanier) in Forsyth and Hall Counties, Georgia. The proposed project is located approximately 11.5 miles northeast of the City of Cumming and is approximately 0.78 mile long.

Columbia 2011
8796 Carruth, Amy S., Glass, William J., Baggett, Klint, Harrison, Lee, Jackson, Paul D. Phase II Investigation of 12 Sites (9CE714, 9CE897, 9CE899, 9CE1332, 9CE2008, 9CE2019, 9CE2027, 9CE2402, 9CE2403, 9CE2409, 9ME70, and 9ME796) for Fort Benning Military Reservation, Chattahoochee and Muscogee Counties, Georgia

Under a continuing services contract with the U.S. Army Infantry Center, Directorate of Public Work, Environmental Division, Fort Benning Military Reservation, Panamerican Consultants, Inc. conducted a series of Phase II archaeological investigations at 12 sites within the reservation.

Lincoln 2011
8797 McCarley, Billy J. Phase I Archaeological Survey of the Sigman Road Improvements, Rockdale County, Georgia

The proposed projects consist of the widening and improvement of Sigman Road (CR 435) from east of Lester Road to Dogwood Connector in the central portion of Rockdale County, Georgia, approximately 1.5 miles north of the center of Conyers.

Greene 2011
8798 Koch, Christopher P. New Hope Sidewalks

The proposed project would construct new sidewalks on both sides of New Hope Road between Boat Rock Road to the south and Danforth Road to the north (see Figure 1). This is an approximate distance of 1.8 miles.

Jasper 2011
8799 Trudeau, Mary F. Addendum to the Phase I Archaeological Survey of the Beaver Ruin Multi-Use Trail, Gwinnett County, Georgia

The proposed project would consist of pedestrian infrastructure improvements along the west side of Beaver Ruin Road (State Route [SR] 378) in the vicinity of Summerour Middle School in the City of Norcross in Gwinnett County.

Putnam 2011
8800 Koch, Christopher P. Phase I Archaeological Survey for the Proposed Sidewalk on the North Side of Buford Highway, Gwlnnett County, Georgia

The proposed project would construct a 1.1 mile sidewalk on the west side of Buford Highway (SR 13) and an 1,1 00-foot sidewalk on the east side of Buford Highway (SR 13) from South Berkeley Lake Road/Simpson Circle to North Berkeley Lake Road in Gwinnett County, Georgia (see Figure 1).

Rabun 2011
8801 Keith, Scot J., Botwick, Brad, Severts, Patrick, Tyson, Jackie H., Elliott, Rita F., Matternes, Hugh B., Archual, Adam Phase I Archaeological Survey and Phase II Testing of U.S. 17/SR 25 from Yacht Road to SR 99

Pursuant to Section 106 of the National Historic Preservation Act (NHPA) of 1966 (as amended), the Georgia Department of Transportation (GDOT) funded a Phase I Archaeological Survey and Phase II Archaeological Testing investigation of an 6.3-mile-long section of U.S.

Towns 2011
8802 Wege, Laura, West, Artis Archaeological Assessment TCNS ID 16565 Proposed I95-Foot Monopole Telecommuunications Structure (I 99-Feet overall with Appurtenances) Within A I 00-Foot By I 00-Foot Compound

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

White 2011
8803 McCarley, Billy J. Negative Findings Phase I Archaeological Survey of the Proposed Spur Telecommunications Lease and Access in Hazlehurst, Jeff Davis County, Georgia

Subterraine performed an intensive Phase I archaeological survey on March 21, 2015 of the proposed lease area and access of the Spur telecommunication project located in Hazlehurst (31 ° 54' 20.2" N, 82" 32' 53.6" W).

Whitfield 2010
8804 Hanley, Adam Otis, West, Artis Archaeological Assessment TCNS ID # 18366 Proposed 300-Foot Guyed-Type Telecommunications Structure (31 0-Foot Structure with Appurtenances) Cell Site - Perry Bypass

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site. The subject site includes a proposed 100-foot by 100-foot telecommunications facility.

Cobb 2007