Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8815 Blackwelder, Jon R. Second Addendum to the Phase I Archaeological Survey of the Proposed Lee Road Widening Project, in Douglas County, Georgia

The current addendum addresses the proposed widening of Lee Road from SR 92 to approximately 1,100 feet south of the I-20 interchange (GDOT Project No. MSL00-0004-00(428), P.I. No. 0004428). The first addendum also included GDOT Project No. NHS00-0001-00(917), P.I. No.

Glynn 2010
8816 Ambrosino, James N. An Archaeological and Historical Survey of the Proposed Bowman Loop-Momentum Expansion Project in Elbert and Madison Counties, Georgia

From February 20 to March 7, 2001, Panamerican Consultants, Inc.

Colquitt 2000
8817 Williams, Siska Advance Hardship Acquisition for Parcels 1&2 along Cleveland Hwy.

The project proposes to acquire two parcels (Parcel 1, Benjamin Elliot and Parcel 2, Leonard Wiley) for advance hardship acquisition along the proposed improvements associated with GDOT Project No.122066.

Gwinnett 2006
8818 Roberts, Joseph Phase I Archaeological Survey for Pedestrian Upgrades at 5 Intersections in Washington County, Georgia

The proposed project consists of upgrading the existing traffic signal installations at five intersections in Washington County and within the city limits of Sandersville and Tennille.

Polk 2002
8819 Phase I Cultural Resources Survey of 3,936 Acres of Property around J. Strom Thurmond Lake, McDuffie County, Georgia

A Phase I archaeological survey of 3,936 acres (1,374.4 hectares) around Thurmond Lake, McDuffie County, Georgia was conducted by Panamerican Consultants, Inc. (PCI). The investigations were conducted in conjunction with Gulf South Research Corporation (GSRC) for the U.S.

Banks 2014
8820 Keith, Scot J. Phase I Archaeological Survey of Six Intersections in Forsyth County, Georgia, GDOT PI 001267

GDOT Project P.l. #0012675 proposes to upgrade roadway intersection signals at six highway intersections in Forsyth County, Georgia. The project will upgrade traffic signal equipment, pedestrian platforms, wheelchair ramps, pedestrian signals, and crosswalk striping.

Colquitt 1997
8821 Keith, Scot J. Phase I Addendum Survey for a Segment of Cleveland Highway/SR 11 at East Fork Little River, Lake Lanier

The proposed project for PI No. 122066 would replace the Cleveland Highway/SR 11 bridge over the East Fork Little River (Lake Lanier) in Hall County, Georgia. The project proposes to replace the bridge and add two travel lanes and eight-foot shoulders to the existing roadway.

Columbia 2006
8822 Murphy, Alicia T., West, Artis Archaeological Assessment TCNS ID 12416 Collocation with a 15-Foot by 30-Foot Compound Expansion (Existing 190-Foot Structure within a 50-Foot by 60-Foot Compound) SBA GA-1937-S (Shallowford 2)- T-Mobile Collocation

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Richmond 2006
8823 Morley, Kim, West, Artis Archaeological Assessment TCNS ID 15585 Proposed 195-Foot Monopole Telecommunications Structure (199-Feet overall with Appurtenances) Within A 1 00-Foot By 80-Foot Compound

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Fulton 1976
8824 Lotti, Teresa Ann 122150 widening and Reconstruction of SR 11/US 129 in Hall and Jackson Counties (4th Assessment) and 121340 would construct two parallel bridges on SR 11/US 129 at Allen Creek in Jackson County, Georgia

This reevaluation strictly involves changes for 122150- the widening and reconstruct SR 11/US129 in Hall and Jackson Counties, Georgia.

Chatham 2015