8835 Williams, Siska Statham Elementary School SRTS Pedestrian Enhancements

This project proposes to place crosswalks, signage, sidewalks, curb and gutter, and a retaining wall in the vicinity of Statham Elementary School along Providence Road in Statham, Barrow County, Georgia.

Cherokee 2006
8836 Winterhoff, E. Quent A Phase I Cultural Resource Survey of the Proposed Transco Lawrenceville No. 3 Meter Station at the Intersection of Alcovy Road and Campbell Road in Gwinnett County, Georgia

Apogee Environmental & Archaeological, Inc. conducted a Phase I cultural resource survey of the proposed Transco Lawrenceville No. 3 Meter Station at the intersection of Alcovy Road and Campbell Road in Gwinnett County, Georgia.

Cherokee 2009
8837 Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed Atlanta BeltLine City Hall East Bike and Pedestrian Plaza, Fulton County, Georgia

The project will construct a pedestrian plaza within the Atlanta BeltLine Corridor bounded by North Avenue to the south, Ponce de Leon Avenue to the north, the existing Ponce City Market development to the west, and the Atlanta Beltline Eastside Trail to the east.

Houston 2014
8838 Carlock, Michael D. SR 400 @ SR 53 Continuous Flow Intersection (CFI)

SR 400 consists of four, 12-foot wide lanes (two in each direction) with variable width (64-foot to 40-foot) depressed, grassed median, 12-foot wide left-turn auxiliary lanes, and a mix of rural and urban shoulders.

Houston 2014
8839 Baughman, Pamela J. SR 26 from McKenzie Street to Tybrisa Street at 14 Locations

The proposed project will install Rectangular Rapid Flash Beacons at the following intersections in the City of Tybee Island along SR26/US80: McKenzie Avenue, 2nd Street, 3rd Street, 4th Street, 5th Street, 6th Street, 7th Street, 8th Street, 9th Street, 10th Street, 11th Street, 12th Street, 13t

Harris 1988
8840 Koch, Christopher P. Addendum to Archaeological Reassessment of Project STP-Q14-1(62) dated June 1, 2007

This project was first surveyed and approved by GOOT archaeologists (Mcintosh and Duff 2002). At that time, the project consisted of construction of four passing lanes along US 78/SR 10 In Oglethorpe and Wilkes Counties. The project would begin at M.P.

Paulding 2007
8841 Baughman, Pamela J. SR 47 Southbound Passing Lane, 2nd Addendum/Reevaluation

The proposed project consists of the construction of a southbound passing lane on SR 47 beginning just south of CR 46/Ridge Road and ending just north of the existing bridge over Keg Creek (MP 2.45 to MP 3.88).

Laurens 2015
8842 Williams, Siska Reevaluation of the widening of Talbotton Road/Warm Springs Road

Talbotton/Warm Springs Road Road will be widened for 1.9 miles between 7th Ave. and Woodruff Road/Hilton Ave in Columbus, Georgia.

Colquitt 1998
8843 Kudzu Site Madison County, GA Verizon EnSite No. 25098 TCNS No. 127296 DEA Project No. 21505011

Dynamic Environmental Associates, Inc. (DEA) performed an investigation of a proposed telecommunication tower facility in Madison County, Georgia.

Cook 1998
8844 McKay, Melissa SR 4BU/US 1BU from CS 911/Carswell Ave to CR 358/Waring Street

The proposed project consists of milling, patching, installation of curb and gutter, sidewalk, loops, striping, and raised pavement markers along a 2.5-mile section of SR 4BU/US 1BU in Ware County, Georgia from CS 911/Carswell Avenue to CR 358/Waring Street (MP 1.20 to 3.70).