Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8875 Pietak, Lynn Marie Addendum to the Phase I Archaeological Survey of the South River Trail Phase 5, DeKalb County, Georgia

Since the time of the previously approved Addendum to the Phase I Archaeological Survey of the South River Trail Phase 5, DeKalb County, Georgia, the design of the trail has been further developed and several changes have occurred along the alignment.

Bryan 2001
8876 Lotti, Teresa Ann Improvements to the SR 16 and SR 3/US 19 intersections In Spalding County, Georgia.

The proposed project consists of improvements to the SR 16 and SR 3/US 19 intersections in Spalding County, Georgia. The project has been surveyed four times for archaeology.

Bulloch 2001
8877 Baughman, Pamela J. SR 172 from Madison County Line to SR 8

The proposed project would consist of milling, leveling, resurfacing, wheelchair curb cuts/installation of ADA ramps, shoulder filling, shoulder widening, permanent markings, and raised pavement markings on SR 172 from the Madison County line to SR 8 in Elbert and Hart Counties.

Candler 2001
8878 Pietak, Lynn Marie Phase I Archaeological Survey of Henry County Safe Routes to School

The proposed project would consist of pedestrian infrastructure improvements in the vicinity of McDonough Elementary, Wesley Lakes Elementary, Hampton Elementary, Red Oak Elementary, Fairview Elementary, and Stockbridge Middle School in the cities of McDonough and Stockbridge in Henry County.

Chatham 2001
8879 Smith, Patrick Second Addendum to Phase I Archaeological Survey of the Proposed SR 36 Bridge Replacement over the South River in Butts and Newton Counties, Georgia

The purpose of this second addendum is to address increases in needed right-of-way and easements that now extend the project limits beyond the last revised APE.

Emanuel 2001
8880 Baughman, Pamela J. Phase I Archaeological Survey of the Proposed Sandy Creek Bridge Replacement, Jackson County, Georgia

The proposed project will replace the existing SR 334 bridge over Sandy Creek, which currently has a sub-standard sufficiency rating of 47.76.

Glynn 2001
8881 Krivor, Michael Underwater Archaeological Survey SR 26/US 80 Bridge at Bull River, Chatham County, Georgia

The Georgia Department of Transportation (GDOT) proposes to replace the existing fender system that helps guide the boats underneath the State Road 26 (SR 26)/US 80 Bridge at Bull River, Chatham County, Georgia.

Laurens 2001
8882 Pomfret, James SR 7 at Pennahatchee Creek in Vienna-Culvert Rehab

The proposed project would conduct culvert repairs and maintenance on SR 7 at Pennahatchee Creek in Vienna, GA.

Liberty 2001
8883 Smith, Patrick Third Addendum to Phase I Archaeological Survey of the Proposed SR 36 Bridge Replacement over the South River in Butts and Newton Counties, Georgia

This third addendum addresses a remnant parcel that is located approximately 300 meters north of the southern project corridor terminus. The project area is approximately .10 acre and will be considered a portion of the corridor’s APE.

McIntosh 2001
8884 Pomfret, James SR 22 at Culpepper Creek- Culvert Rehab and Scour Repair

The proposed project would conduct culvert repairs on SR 22 at Culpepper Creek in Crawford County, GA.

Telfair 2001