Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8915 Baughman, Pamela J. 1-75 Interchange at CR 665/Carbondale Rd.

This project involves the reconstruction of the 1-75 at CR 665/Carbondale Rd. Interchange beginning along 1-75 approximately 2500 feet (ft.) south of CR 665/Carbondale Rd (MP 2.27) and ending approximately 2500 ft. north of CR 665/Carbondale Rd (MP 3.41) in Whitfield County.

Muscogee 1997
8916 Mustonen, Heather District 5 Maintenance Projects along SR 38/US 84 and SR 23/US 301

The proposed projects would consist of the resurfacing, milling, and paving of SR 23 and SR 38.

Chatham 2006
8917 Quirk, Phillip W. Phase I Archaeological Survey of the Cobb Galleria Pedestrian Bridge, Cobb County, Georgia.

Cobb County Department of Transportation proposes to construct a pedestrian/transit bridge across Interstate (I)-285. The bridge approach would begin at a point along an existing private roadway that services the Cobb Galleria.

Chatham 2005
8918 Koch, Christopher P. GDOT Surplus Property GEP-067-140

The proposed project would consist of the sale of surplus property currently owned by the department.  The subject parcel contains approximately 1.30 acres and is on the south side of SR 280 (Delk Road), east of SR 3 (Cobb Parkway) (see Figure 1).

Muscogee 1997
8919 Koch, Christopher P. GDOT Surplus Property GEP-089-626

The proposed project would consist of the sale of surplus property currently owned by the Department. The subject parcel contains approximately 0.60 acre (-200 feet by 125 feet) and is located, approximately 1,100 feet west of the intersection of US 278 and Swift Street.

Jackson 1997
8920 Botwick, Brad Phase I Archaeological Survey, 1-75 Managed Lanes Concept, Forest Parkway lnterchange/NB CD System

The project would involve construction of a CD system on the northbound side of 1-75 between Forest Parkway to the south and 1-285 to eliminate the weave between Forest Parkway traffic entering I-75 and 1-75 traffic exiting to 1-285, This would entail adding a lane to existing 1-75 between the ex

Cobb 2015
8921 Koch, Christopher P. Addendum to the Phase I Archaeological Survey for the Proposed Mcintosh Road Bridge Replacement

The proposed project would replace the existing structurally deficient bridge on Fayette County Road (CR) 360/McIntosh Road/Spalding County CR 502 over the Flint River.

Paulding 2015
8922 Koch, Christopher P. GDOT Surplus Property GEP-089-628A

The proposed project would consist of the sale of surplus property currently owned by the Department.

Jackson 1995
8923 Koch, Christopher P. GDOT Surplus Property GEP-089-6288

The proposed project would consist of the sale of surplus property currently owned by the Department.  The subject parcel contains approximately 0.48-acre and is adjacent to, and north of, US 278, approximately 650 feet west of the intersection of US 278, to the south of the property, and Sw

Jackson 1993
8924 Carlock, Michael D. Archaeological Survey of the Proposed State Route 24 Widening and Improvement Corridor, Putnam County, Georgia: Addendum for a Retention Pond on Parcel 89b

This project is currently under construction and is widening and reconstructing US 441/SR 24 from just north of CR 245/Cay Road the Eatonton Bypass at US 129/SR 44 (Figure 1).

Madison 2013