Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8955 Quirk, Phillip W. Phase I Archaeological Survey for Proposed Bridge Replacement at SR 63 over Middle Fork of the Broad River, Banks County, Georgia

The proposed Georgia Department of Transportation (GDOT) Project CSBRG-0007-00(158), P.I. No. 0007158, located in Banks County, would consist of the replacement of the bridge on State Route (SR) 63 at the Middle Fork Broad River and adjusting vertical curves along the bridge approaches.

Chatham 2013
8956 Williams, Siska Maintenance Activities on SR 27 and SR 30/31

The proposed project would provide maintenance activities on SR 27 from CR 230 to CS 743 and SR 31 from SR 132 to SR 27. The project includes paving activities including curb cuts at several locations (see below). No ROW or easement would be required.

Coweta 2007
8957 Gale, Sara H. Adding passing lanes between Barnesville and Forsyth along US 41/SR 18

The project to widen US 41 between Barnesville and Forsyth in order to create passing lanes is already under construction. A property owner wants two (2) flatter driveways that would require an increase in easements for construction.

Fayette 2007
8958 McKay, Melissa SR 34 at Chattahoochee River

The proposed project would consist of maintenance of GDOT Bridge No. 149-0003-0, located at State Route SR 34 over the Chattahoochee River (see attached location map). Work on the bridge would include the following:

Newton 2001
8959 Carlock, Michael D. Maintenance and Minor Repair Including Curb Cuts on SR 21 from 0.10 Mile North of CSX Railroad to CS 590/Smith Avenue in Savannah.

The proposed project consists of milling, resurfacing, loop detectors, striping, raised pavement markers, and concrete sidewalks. There are fourteen curb cut (wheelchair) ramps to be constructed.

Bibb 2000
8960 Lotti, Teresa Ann Passing lanes along SR 53 between the towns of Tate and Holcomb in Pickens County, Georgia.

The proposed project would construct two passing lanes on SR 53 between the towns of Tate and Holcomb in Pickens County, Georgia. The project has been surveyed twice, once in February 2002 and again in March of 2007 by Teresa Lotti (HP010927-004).

Pickens 2012
8961 Botwick, Brad Phase I Archaeology Survey of Four Intersections in Upson County, Georgia

Intersection A: SR 74/East Main Street, North Bethel Street, South Bethel Street and SR

Monroe 2000
8962 Lewis, Clifford Thomas Second Addendum To The Phase I Archaeological Survey Of The Proposed Social Circle Bypass, Newton and Walton Counties, Georgia

During the course of this project, several design changes have been made that have resulted in the need for additional survey. The original survey was completed in June of 2007 (Quirk 2007).

Clarke 1876
8963 Gale, Sara H. CR 1385/Buffington Road Bridge Replacement at Morning Creek Tributary

The proposed project would consist of the replacement of the existing bridge on County Road (CR) 1385/Buffington Road over Morning Creek Tributary in Fulton County. The proposed project has been revised to remove the temporary detour bridge and shorten the project limits.

Clarke 1976
8964 Lotti, Teresa Ann Northwest Eastman Bypass in Dodge County, Georgia.

The proposed project would create a Northwest Eastman Bypass in Dodge and Bleckley Counties, Georgia. The projects were subjected to three previous surveys by Southeastern Archeological Services, Inc. in 1999 and Teresa Lotti in 2004 and 2008.

Jackson 1997