Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8997 Lotti, Teresa Ann The proposed projects would consist of various maintenance activities on SR 520 Business and SR 3 from SR 38/US 84 in Dougherty and Lee Counties, Georgia.

The proposed project would consist of milling, inlay, patching, leveling, paving the shoulders, permanent marking, installation of rumble strips, and the reconstruction of existing and construction of new ADA ramps/curb cuts along SR 520 Business beginning on the north side of the SR 520 intercha

Jasper County, GA 1996
8998 Falvey, Lauren W. Phase I Archaeological Survey of Proposed Resurfacing along State Route 45 in Early and Calhoun Counties, Georgia

The proposed work consists of resurfacing, patching, milling, 2 foot shoulder widening, curb cuts, striping, and raised pavement markers with 4 foot earth shoulder filling along a 12.16 mile section of State Route (SR) 45 from SR 62 in Early County to SR 37 in Calhoun County (Figure 1).

Gordon County, GA 1991
8999 Baughman, Pamela J. State Route (SR) 74 at Norfolk Southern #71S831X in Senoia- 2"d Addendum

The proposed project would replace the SR 74 bridge over the Norfolk Southern Railroad (ID #718831X), located approximately 0.22 miles northeast of the intersection of SR 74 and SR 16 in eastern Coweta County.

Clayton County, GA 2012
9000 Baughman, Pamela J. Bridge Replacement on SR 47/US 221 at Greenbrier Creek

The proposed project would consist of the replacement of the existing bridge carrying SR 47 /US 221 over Greenbrier Creek northeast of Appling, in Columbia County, Georgia. Existing right-of-way is 100 feet. Proposed right-of-way would vary from 100 feet to 125 feet.

Cobb County, GA 2012
9001 Elliott, Rita F. Archaeological Investigations 2005-2012: Georgia State Railroad MuseumSavannah Visitors Center &Savannah History Museum

Between July 2005 and January 2010 Coastal Heritage Society (CHS) archaeologists undertook 34 archaeologi­cal projects in the Savannah area, with one additional project conducted in 2012.

Fulton County, GA 2012
9002 Gale, Sara H. Bridge replacement along SR 230 over Turkey Creek

The proposed project would consist of the replacement of the structurally deficient bridge on SR 230 over Turkey Creek 9.5 miles west of Vienna in Dooly County, Georgia.

Columbia County, GA 1998
9003 Lotti, Teresa Ann Maintenance on SR 155 from SR 154 to SR 13 in DeKalb County, Georgia.

The proposed project includes general maintenance along SR 155 in DeKalb County. The proposed project would mill, resurface, overlay, and add curb and gutter or header curbs to SR 155 beginning at Memorial Drive and ending at SR 13/Buford Highway in DeKalb County.

Richmond County, GA 1998
9004 Carlock, Michael D. Phase I Archaeological Survey of Proposed Maintenance Improvements along SR 26/SR 67 from Mill Creek to CS 619/North College Street in Bulloch County, Georgia

The proposed work consists of milling, resurfacing, loop detectors, rumble strips, striping, raised pavement markers and curb cuts along a 6.723 mile section of SR 26/SR 67 in Bulloch County (Figure-1), The proposed project would begin at the north end of the Mill Creek bridge approach slab joint

Polk County, GA 1996
9005 Mustonen, Heather Interchange Reconstruction -Interstate 75 at SR 27, Dooly County

The proposed project would replace the existing SR 27 bridge over I-75 on new alignment with a 346-foot long by 71.25-foot wide structure. The proposed typical section of SR 27 would include two 12-foot travel lanes with 4-foot paved shoulders and 6-foot grass shoulders.

Jones County, GA 1983
9006 Elliott, Rita F. From Mud to Brick:Archaeological Investigations atOld Fort JacksonSavannah, Georgia

This report covers three archaeological investiga­tions at Fort James Jackson conducted by Coastal Heritage Society (CHS) staff archaeologists be­tween 2007 and 2011. This includes excavations on the tide tunnel (CHS Project No. 20), the terreplein (CHS Project No.

Columbia County, GA 1976