Report Number Author(s) Title Abstract Summary County Year
8905 Lotti, Teresa Ann Safe Routes to School along Carlton Road in Palmetto, Georgia.

The proposed project would install sidewalks and curbs and gutters along the north side of Carlton Road beginning at its intersection with SR 154/Cascade Palmetto Highway and terminating at its intersection with Brentwood Drive.

Douglas 2005
8906 Lotti, Teresa Ann Project M004564 would conduct bridge maintenance on 1~20 east and west bound over the Alcovy River in Newton County, Georgia. Project M004623 would conduct bridge maintenance · on 1-20 east and west bound over the Alcovy River tributary in Newton County,

The proposed projects would repair the bridges-on I-20, east and west bound, at the Alcovy River and Alcovy River Tributary in Newton County, Georgia.

Chatham 2006
8907 Green, Lillian Phase I Archaeological Survey of Pedestrian and BicyCle Lane Improvements along SR 42/Moreland Avenue, Atlanta, DeKalb and Fulton Counties, Georgia

The proposed project limits include an approximately 2,060 (.4 mile) stretch of Moreland Avenue from approximately 80 feet north of Mansfield A venue, to an end point at the DeKalb Avenue ramps (Figures 5-12).

Floyd 2007
8908 Moss, Richard A. Phase I Archaeological Survey of Traffic Signal Upgrades at Ten Locations Along Piedmont Road in Buckhead, Fulton County, Georgia

The proposed project would consist of upgrading the existing traffic signal installations at 10 intersections in Fulton County and the city of Atlanta.

Jackson 2002
8909 Keith, Scot J. Phase I Archaeological Survey of the Kingsley Charter Elementary School, DeKalb County Safe Routes to School Program

Kingsley Charter School is located in a residential neighborhood in DeKalb County.

Chatham 2003
8910 Blackwelder, Jon R. Addendum to the Phase I Archaeological Survey of the Proposed Bob Callan Trunk Trail, Phase 2, along Rottenwood Creek, Cobb County, Georgia

The APE for the current addendum includes four segments of easement for construction of a multiuse trail for pedestrians and cyclists as described on a separate sheet.  A 100-foot expanded survey corridor (ESC) was also surveyed as stipulated in the Environmental Procedures Manual.

Catoosa 2001
8911 Perrine, Rachel Phase I Archaeological Survey for the Construction of a Diverging Diamond Interchange at State Route 6/ Camp Creek Parkway and Interstate 285, East Point, Fulton County, Georgia

The proposed project is at the interchange of Interstate 285 (I-285) and State Route (SR) 6/Camp Creek Parkway, in the city of East Point, Fulton County, Georgia.

Whitfield 2001
8912 Roberts, Joseph Phase I Archaeological Survey for ATMS Upgrades to 30 Intersections in Fulton County, Georgia

The project would include the installation of equipment and software needed to implement adaptive traffic signal management, known as an Advanced Transportation Management System (ATMS), including vehicle count stations and vehicle detection devices.

Bacon 2013
8913 Carlock, Michael D. Phase I Archaeological Survey of Proposed Diverging Diamond Interchange at the Intersection of 1-75 and State Route 20 in Henry County, Georgia

The proposed project would create a Diverging Diamond Interchange at 1-75 and State Route (SR) 20 in Henry County (Figures 1 and 2).

Lanier 2013
8914 Koch, Christopher P. Phase I Archaeological Survey at SR 162 From CR 511/ Brown Bridge Road to CR 34/Old Salem

The proposed project is part of a larger project for which field studies were approved in 2007. The 2007 project proposed to widen Salem Road from Brown Bridge Road to Flat Shoals Road from two lanes to four lanes with turn lanes at key intersections and 20 feet of raised medians and sidewalks.

Hall 2003