Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8865 Krivor, Michael Submerged Cultural Resources Investigation, SR 25 Spur East at Mackay River, Glynn County, Georgia

The proposed project would replace the northwest fender system (which helps guide boats underneath the FJ Torras Bridge so that they don't strike the bridge).

Houston County, GA 2006
8866 McKay, Melissa SR 14 from south of CS 6029/Norman Berry Drive to CS 3586/Spring Street

The proposed project consists of milling, resurfacing, leveling, patching, striping and the installation of raised pavement markers on a 5.4 mile section of SR 14 in Fulton County, Georgia from CS 6029/Norman Berry Street to CS 3586/Spring Street (MP 19.68 to 25.08}.

Hancock County, GA 2003
8867 Baughman, Pamela J. Old Petersburg Rd/Oid Evans Rd from Baston Rd to Washington Rd

This project consists of the widening and improvement of Old Petersburg Road and Old Evans Road. The proposed concept includes a four-lane (two lanes in each direction) roadway with bike lanes and a 20-foot raised median on approximately 110-150' of proposed right-of-way.

Putnam County, GA 2003
8868 Keith, Scot J. Phase I Cultural Resource Survey of SR 122 lmprovments, CR 39 to CR 68, Ware County, Georgia

The Georgia Department of Transportation proposes to realign SR 122/Carswell Avenue to soften the sharp reverse curves that currently exist between Corbitt Road and Pine Valley Road/CR 68 to reduce car crash frequency and severity. The current plans offer three possible alternatives.

Towns County, GA 2002
8869 Williams, Siska Reevaluation of Grade Separation ofSR 316/US29@ SR 11

Original Description: The project would grade separate the existing at-grade intersection of State Route (SR) 316 with SR 11 in Barrow County, Georgia. The proposed grade separation would include full interchange access from SR 316 in both directions to SR 11 in both directions and vice-versa.

Pulaski County, GA 1996
8870 Williams, Siska 1-75 at CR 824/Jodeco Road-Interchange Improvement

The reconstruction of Jodeco Road (CR 824) begins on Jodeco Road approximately 846 feet west of the intersection of Plantation Boulevard.

Laurens County, GA 2000
8871 Owens, Daphne L. ArchaeolOgical Phase I Survey for the Downtown Dallas LCI Project. Paulding County, Georgia

The proposed project would be to provide streetscape improvements in the City of Dallas to streets adjacent to the Downtown Plaza and previously Improved streets.

Chattahoochee County, GA 1999
8872 Williams, Siska CR 228/Garrison Road at NS #729365A in Chauncey

The proposed project consists of the installation of warning device equipment on railroad right-of-way, the installation and/or removal of signing for the devices, and the installation of pavement marking for the devices along the roadway.

Pulaski County, GA 1992
8873 Owens, Daphne L. Phase I Archaeological Survey for Downtown Griffin Pedestrian and Bicycle Facilities, Spalding Co

The proposed project will reduce the number of travel lanes on Hill Street from four lanes t two lanes. Hill Street will be restriped to provide 15ft wide shared lanes with sharrow pavement markings to accommodate both automobiles and bicycles.

Gordon County, GA 1992
8874 Blackwelder, Jon R. Second Addendum to Phase I Archaeological Survey for the SR 90 over the CSX Railroad Bridge Replacement Project, Macon County, Georgia

The proposed project is a bridge replacement on State Route SR 90 over the CSX Railroad about 8 miles southeast of the City of Ideal.

Glynn County, GA 2002