Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8845 Williams, Siska SR 410 from CR 5172/Montreal Road to SR 10

The proposed work consists of milling, resurfacing, leveling, patching, striping, and raised pavement markers. There are eight (8) curb cut (wheelchair) ramps to be constructed.

Coweta 1998
8846 Williams, Siska A Safe Routes to School (SRTS) project consisting of safety Improvements along East Park Avenue in the vicinity of W.G. Nunn Elem. School and J.L. Newbern Middle School

This project is a Safe Routes to School (SRTS) infrastructure project that will improve pedestrian and bicycle accessibility for students within a 1 mile radius of W.G. Nunn Elementary School and J.. L. Newbern Middle School in Valdosta Ga,.

Fayette 1998
8847 Shiloh Hills Site Cobb County, GA ATC No. 303413 TCNS No. 126487 DEA Project No. 21504032

Dynamic Environmental Associates, Inc. (DEA) performed an investigation of a proposed telecommunication tower compound expansion in Cobb County, Georgia.

Harris 2002
8848 Botwick, Brad Addendum Phase I Archaeological Survey of Lanier Islands Parkway, Hall County, Georgia

In October 2012 and May 2013, a Phase I Archaeological Survey of a project corridor and an intensive survey and testing of two cemeteries were completed for the widening and realignment of SR 347/Lanier Islands Parkway project (Tankersley and Matternes 2014).

Colquitt 2001
8849 Williams, Siska SR 85 from Fayette County Line to SR 331

The project begins at the bridge joint on the bridge over Camp Creek at Fayette County line (MP 0.00). The project ends north side of SR 331/Forest Parkway. The project length is approximately 12.8 miles. Note project log details northbound and southbound separately.

Fayette 2013
8850 Pietak, Lynn Marie Phase I Archaeological Survey of DeKalb County Safe Routes to School

The proposed project consists of pedestrian and bicycling improvements for students, parents and teachers in the cities of Decatur, Doraville, Lithonia, and Atlanta, in DeKalb County, Georgia.

Colquitt 2001
8851 Williams, Siska Stanton Road Surplus Property

The Department is intending to exchange property with Baxter Pharmaceuticals to facilitate a future development in this area. Track 1: The property is located to the east of the 1-20 and US 278/SR 12 interchange (located to the east of Stanton Road).

Wilkinson 2013
8852 Quirk, Phillip W. Addendum to Phase I Archaeological Survey of Intersection Improvements for SR 8/US 78/Bankhead Highway at CR 286/Mann Road/Mason Creek Road and CR 808/Post Road, Douglas County

See attached sheet for 2011 and 2013 project descriptions and a review of project changes. The changes include two new areas of APE that are beyond the extent of the ESC surveyed in 2011 (Figure 2). The northernmost of these is the location of a drainage basin comprising .48 acre.

Colquitt 2001
8853 McCarley, Billy J. Addendum Phase I Archaeological Survey of Proposed SR 81 at SR 142 Intersection Improvement

The proposed project is located at the SR 81 and SR 1421ntersection in Newton County. The project would relocate the intersection tie-in approximately 250 feet south of the existing location to address safety concerns.

Pulaski 1998
8854 Blackwelder, Jon R. Third Addendum to Phase I Archaeological Survey for the SR 90 over the CSX Railroad Bridge Replacement Project, Macon County, Georgia

The proposed project is a bridge replacement on State Route (SR) 90 over the CSX Railroad about 8 miles southeast of the City of Ideal.

Walker 2015