Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
9778 Beazley, Matthew Section 106 Review TCNS ID 135762 Proposed 400-Foot Guyed-Type Telecommunications Structure (420-Foot Overall Height Including Appurtenances)

Environmental Corporation of America’s (ECA) client, Southern Communications Services,

d/b/a SouthernLINC Wireless c/o Value Concepts, Inc., is proposing to lease a 60-foot by 60-

foot (18-meter by 18-meter) area for the construction of a telecommunications facility as

Meriwether 2016
9779 DuBois, Autumn Section 106 Review TCNS ID 132653 Proposed 150-Foot Monopole Communications Structure (163-Foot Overall Height Including Appurtenances)

Environmental Corporation of America’s (ECA) client, Georgia Power Company, is proposing

to construct a communications facility as described in the following FCC Form 620, New Tower

(NT) Submission Packet. ECA understands that Georgia Power Company plans to construct a

Tift 2015
9780 Butler, C. Scott Phase I Archaeological Backhoe Survey of the 0.97-acre Hutchinson Island Slip 1 Project Tract

During 19-24 June 2016, Brockington and Associates Inc. (Brockington) completed a Phase I backhoe survey of a 0.97-acre parcel adjacent to and immediately east of Slip 1 and the Westin Resort Hotel on the southern portion of Hutchinson Island, Chatham County, Georgia.

Chatham 2016
9781 Beazley, Matthew Section 106 Review TCNS ID 132716 Proposed 150-Foot Monopole Communications Structure (163-Foot Overall Height Including Appurtenances)

Environmental Corporation of America’s (ECA) client, Georgia Power Company, is proposing

to construct a communications facility as described in the following FCC Form 620, New Tower

(NT) Submission Packet. ECA understands that Georgia Power Company plans to construct a

Chattooga 2015
9782 Janssen, Virginia M. SECTION 106 REVIEW FCC FORM 620 Brasstown Site Warren County, GA Verizon EnSite No. 23382 DEA Project No. 21501016

APE for Direct Effects

Warren 2015
9783 Pappas, Andrew A. Phase I Archaeological Resources Survey of County Road (CR) 137 Spanish Creek Road Bridge Replacement (ID# 049-0042-0) Over Long Branch, Charlton County, Georgia

As part of the Georgia Department of Transportation's (GDOT) Low Impact Bridge Program (LIBP), a potential bridge replacement has been identified along County Road (CR) 137, Spanish Creek Road, located in Charlton County, Georgia.

Charlton 2017
9784 Pappas, Andrew A. Phase I Archaeological Resources Survey of County Road (CR) 32, Camp Branch Road Bridge Replacement 2 (ID # 299-5087-0) Over Greasy Branch, Ware County, Georgia

As part of the Georgia Department of Transportation's (GDOT) Low Impact Bridge Program (LISP), a potential bridge replacement has been identified along County Road (CR) 32, Camp Branch Road, located in Ware County, Georgia (Figures 1 and 2).

Ware 2017
9785 Perrine, Wesley A. Phase I Archaeological Survey of Proposed Resurfacing along State Route 38 in Lowndes County, Georgia

The proposed work will take place along a 1.7 mile section of State Route (SR) 38 in Lowndes County beginning on the west side of Forrest Avenue and ending 130 feet east of Blanchard Street with exceptions at the railroads and between 619 feet west and 582 east of the Hollywood Street intersectio

Lowndes 2017
9786 Eckert, James W. Cultural Resource Survey Report Lovett Site Laurens County, GA Verizon EnSite No. 24389 TCNS No. 126143 DEA Project No. 2153015

Dynamic Environmental Associates, Inc. (DEA) performed an investigation of a proposed telecommunication tower facility in Laurens County, Georgia.

Laurens 2015
9787 Perrine, Wesley A. Phase I Archaeological Survey of Proposed Resurfacing along State Route 5 Business in Cherokee County, Georgia

The proposed work will take place along a 3.97 mile section of State Route (SR) 5 Business (BU) in Cherokee County beginning at the intersection of Killian Road to the intersection of Interstate (I-) 575 (Figure 1).

Cherokee 2017