Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
9808 Phase II Testing of Fifteen Archaeological Sites Associated with the Planned Center Point-Moss Lake No. 2 Transmission Line, Gordon and Whitfield Counties, Georgia

Tennessee Valley Authority (TVA) contracted with Tennessee Valley Archaeological Research (TVAR) to conduct Phase II testing at 15 archaeological sites (9GO354, 9GO356, 9GO357, 9GO361, 9GO365, 9GO367, 9GO370, 9GO375, 9GO376, 9GO379, 9GO386, 9GO390, 9WD164, 9WD165, and 9WD171) located within the a

Gordon 2016
9809 Erickson, Luke W. Archaeological Assessment of the Gwinnett and Barrow Counties Resurfacing Project

Archeological Assessment of the Gwinnett and Barrow Counties Resurfacing Project.

Barrow 2003
9810 Lowrey, Jonathan D. A Phase I Archaeological Survey for the Proposed Madras Connector Project in Coweta County, Georgia

The proposed Madras Connector would provide connectivity via a new location from United States Highway (US) 29/State Route (SR) 14 (US 29) to the future Interstate (1)-85 at Almajack Boulevard Interchange, as well as a connection to US 29/SR 14 from the Hal Jones Road/Happy Valley Road intersecti

Coweta 2017
9811 Carlock, Michael D. Phase I Archaeological Survey of the Proposed Replacement of Three Bridges on SR 37 at Pachitla Creek and Overflows in Calhoun County, Georgia

                This project proposes to replace three existing insufficient bridges over Pachitla Creek and overflows located along State Route (SR) 37 approximately 1.2 miles west of the city of Dickey in Calhoun County, Georgia (Figures 1 and 2).

Calhoun 2017
9812 McMakin, Todd Cultural Resources Assessment of the North Cross Creek Cellular Tower Fulton County, Georgia

This report represents the findings of a cultural resources assessment for the construction of an

approximately 46-meter (190-foot) monopole to be placed in private lot in Atlanta, Georgia

(1221 Cross Creek Pkwy, NW, Atlanta, GA 30327). A pedestrian archaeological survey was

Fulton 2014
9813 DuBois, Autumn Section 106 Review TCNS ID 157435 Proposed 75-Foot Tall Pole Structure (75-Foot Overall Height Including Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site. The proposed undertaking would include a proposed 10-foot by 10-foot (3-meter by 3-meter) area that would include a 75-foot tall overall height pole structure.

Seminole 2017
9814 Sweeney, Alexander Y. Phase I Cultural Resources Survey of the 190-Acre Imerys Mine Expansion

Between October 17 and 28 2016, Brockington and Associates, Inc. (Brockington) conducted an intensive Phase I cultural resources survey of the proposed Imerys mine expansion in Andersonville, Macon County, Georgia.

Macon 2017
9815 VanBuren, Maurie McConnell Road-Woodlore 230 kV Transmission Line

This report documents that Georgia Transmission Corporation’s McConnell Road-Woodlore

230 kV Transmission Line project will not have an adverse effect on historic resources. The

Transmission Line will begin at the existing McConnell Road Substation on the south side of

Cobb 2008
9816 Lewis, Clifford Thomas Phase I Archaeological Survey of the Proposed Valdosta LN-11 Pipeline Regulator and Monitor Installations Project

Cardno has completed a Phase I archaeological survey in advance of the proposed installation of

the Valdosta LN-11 Pipeline Regulator and Monitor, in Lowndes County, Georgia. This letter has

Lowndes 2016
9817 Jackson, Paul D. A Phase I Archaeological Direct Effects Survey for the Proposed Tara/GA-01201 Cellular Tower in Clayton County, Georgia

TerraXplorations, Inc. (TerraX) of Mobile, Alabama was contracted by TRILEAF Corporation of Maitland, Florida to conduct a Phase I archaeological direct effects survey for the proposed Tara cellular tower in Clayton County, Georgia.

Clayton 2017