Report Number Author(s) Title Abstract Summary County Year
9828 Ogden, Quinn-Monique Cultural Resources Survey Champagne A Tower Site Ringgold, Catoosa County, Georgia S&ME Project No. 4181-17-001B, Phase 23

S&ME, Inc. (S&ME) has completed a Cultural Resources Survey for Verizon Wireless in support of the proposed development of a new 10,000 square feet cellular tower facility with a 89 feet monopole tower, associated support facilities, and access road.

Catoosa 2017
9829 Roberts, Joseph Phase I Archaeological Addendum Survey for SR 32 over Bear Creek Bridge Replacement, Coffee County, Georgia

The purpose of the project is to replace a structurally deficient bridge on SR 32 over Bear Creek in Coffee County, Georgia (see Figure 1). Existing SR 32 at Bear Creek is a two-lane, rural road, with 12-foot wide travel lanes and paved shoulders that vary from 2 to 4 feet wide.

Coffee 2017
9830 Jackson, Paul D. A PHASE I ARCHAEOLOGICAL DIRECT EFFECTS AND VISUAL EFFECTS SURVEY FOR THE PROPOSED DAVID HARRIS CELLULAR TOWER MUSCOGEE COUNTY, GEORGIA

TerraXplorations, Inc. (TerraX) of Mobile, Alabama was contracted by Trileaf Corporation (Trileat) of Maitland, Florida to conduct a Phase I archaeological direct effects and visual effects survey for the proposed David Harris cellular tower in Muscogee County, Georgia.

Muscogee 2017
9831 Blackwelder, Jon R. Second Addendum to the Phase I Archaeological Survey of the Flat Shoals Road at Covington Bypass Intersection Improvements, Newton County, Georgia

Original Project Descliption (2014)

Newton 2017
9832 Carlock, Michael D. Phase I Archaeological Survey of the Proposed Bridge Replacement on SR 93/SR 111 at Little Tired Creek in Grady County, Georgia

The proposed project would consist of the replacement of the insufficient existing bridge along State Route (SR) 93/SR 111 at Little Tired Creek, located approximately one mile north of the city of Cairo in Grady County, Georgia (Figure 1 and 2).

Grady 2017
9833 Moss, Ashley E. Phase I Archaeological Survey for the Bridge Replacement of SR 80 at Middle Creek

The proposed project would replace a substandard bridge on SR 80 over Middle Creek located approximately 4 miles north of Camak, Georgia. The existing bridge is insufficient due to the age of the structure and the posted weight restrictions.

Warren 2017
9834 Falvey, Lauren W. Phase I Archaeological Survey for Proposed Bridge Replacement on State Route 158 over Willacoochee River, Berrien, Irwin, and Coffee Counties, Georgia

The project is located on State Route (SR) 158, 1.2 miles west of SR 90, when Berrien, Irwin, and Coffee Counties meet (Figure 1). The proposed project would replace the existing SR 158 bridge over Willacoochee River (Bridge ID 0 19-0034-0).

Berrien 2017
9835 Carlock, Michael D. Phase I Archaeological Survey of the Proposed Bridge Replacement on SR 111 over Little Creek Tributary Five Miles South of Moultrie in Colquitt County, Georgia

This project proposes to replace the existing insufficient bridge over Little Creek Tributary which is five miles south of Moultrie on State Route (SR) 111 in Colquitt County, Georgia (Figures 1 and 2). The existing bridge is 152 feet long by 45.6 feet wide with two 12 foot travel lanes and

Colquitt 2017
9836 Pappas, Andrew A. Phase I Archaeological Resources Survey of County Road (CR) 52, Ralph Davis Road Bridge Replacement (ID # 049-5037-0) Over Long Branch Tributary, Charlton County, Georgia.

As part of the Georgia Department of Transportation's (GDOT) Low Impact Bridge Program (LIBP), a potential bridge replacement has been identified along County Road (CR) 52, Ralph Davis Road, located in Charlton County, Georgia (Figures 1 and 2).

Charlton 2017
9837 Moss, Ashley E., Moss, Richard A. Addendum Phase I Archaeological Survey for Stream Restoration, Interstate (I)-75 at State Route (SR) 156/Red Bud Road Interchange Improvements, Gordon County, Georgia

The original project description for PI 610750, under construction, has not changed.

Gordon 2017