Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
9737 Wettstaed, James R. Cultural Resource Investigations for Long Ridge Timber Sale, Hitchiti Experimental Forest, Oconee Ranger District, Chattahoochee-Oconee National Forests, Jones County, Georgia

The Oconee Ranger District of the Chattahoochee-Oconee National Forests is proposing to harvest timber in Jones County, Georgia on 758 acres in Compartments 7, 9, and 10 using a commercial timber contract). All of the proposed timber harvest area has previously been surveyed (Davis et al.

Jones 2012
9738 Kirkland, S. Dwight 2016 Phase I AND II Archaeological Investigations at the Propsed Lee County Solar Array Facility, Lee County, Georgia

 

Abstract 9738.

Lee 2016
9739 O'Steen, Lisa Diane Archaeological Resources Survey of Part of the Proposed 2001 Bishop Bypass Oconee County, Georgia

This document present the results of an archaeological resurvey of a portion of a corridor for a highway bypass around the east side of Bishop, Oconee County, Georgia. The bypass corridor connects State Route 24/U.S.

Oconee 2006
9740 Lowrey, Jonathan D. Phase I Cultural Resources Survey for the Proposed Disposal of Excess Land United States Postal Service Parcel Adjacent to the Douglasville Main Office 6000 Stewart Parkway

AECOM Technical Services, Inc. (AECOM) of Atlanta, Georgia was contracted by the United States Postal Service (USPS) to complete a Phase I Cultural Resources Survey (Survey) to support a potential real estate transaction.

Douglas 2016
9741 Ricks, Rebecca G. Cultural Resource Survey Proposed Telecommunications Tower Site, Site Name: Harris, Duluth, GA

On behalf of Cellco Partnership and its controlled affiliates doing business as Verizon Wireless (Verizon Wireless), Terracon Consultants, Inc. (Terracon) conducted a Cultural Resource Survey (CRS) for the proposed Harris telecommunications site located in Duluth, Georgia.

Gwinnett 2014
9742 Ricks, Rebecca G. Cultural Resource Survey, Proposed Telecommunications Tower Site, Site Name: Enginerds, Norcross, GA

On behalf of Cellco Partnership and its controlled affiliates doing business as Verizon Wireless (Verizon Wireless), Terracon Consultants, Inc. (Terracon) conducted a Cultural Resource Survey (CRS) for the proposed Enginerds telecommunications site located in Gwinnett County, Georgia.

Gwinnett 2014
9743 Webb, Robert S. Cultural Resources Survey Tom B. David Airport Improvements Calhoun, Gordon County, Georgia

A Phase I cultural resources survey was conducted of the Tom B.

Gordon 2017
9744 Bruce-Vaughters, Rebecca E. Resurvey of the Toccoa Ridges, Locust Stake, and Lee Mountain Timber Sales, Chattooga River Ranger District

A cultural resource survey has been completed for 47 acres of the Toccoa Ridges and Lee Mountain Timber Sales that were not included in the original surveys of the Chattahoochee National Forest.

Habersham 2017
9745 Trudeau, Mary F. Second Addendum to the Phase I Archaeological Survey of the Beaver Ruin Multi-Use Trail, Gwinnett County, Georgia

The proposed second addendum, to the project would provide a 1 0-foot multi-use path for bicycle and pedestrian accommodations along the south side of Beaver Ruin Road (State Route [SR] 378) for approximately 1.5 miles from the intersection of Beaver Ruin Road (SR 378) and Price Place to the inte

Gwinnett 2017
9746 Wettstaed, James R. Monitoring for the Claybourne Timber Sale, Oconee Ranger District, Chattahoochee-Oconee National Forests, Jasper County, Georgia

The Oconee National Forest proposes to complete a commercial timber sale in Jasper County, Georgia.

Jasper 2016