Report Number Author(s) Title Abstract Summary County Year
9707 Gresham, Thomas H. Archeological Phase I/II Survey of Proposed Improvements to Jonesboro Road, Clayton and Henry Counties, Georgia

The Georgia Department of Transportation intends to widen and improve an approximately 7.7-mi length of Jonesboro Road, from its intersection with Interstate Highway 75 in Henry County to U.S. Highway 19/41 in Clayton County (Figure 1). This is GDOT Project #STP-1583(12) and HP #070907-001.

Clayton 2009
9708 Carlock, Michael D. Phase I Archaeological Survey of Proposed Widening of On-Ramps for 1-285/SR 407 at SR 8/Donald Lee Hollowell Parkway Northwest in Fulton County, Georgia

The proposed project would take place on the northbound and southbound entrance ramps to 1-285 from SR 8/US 278 in the City of Atlanta in Fulton County (Figures 1-3). The existing typical section of each entrance ramp consists of approximately 16 to 24-foot concrete travel lanes.

Fulton 2017
9709 Williams, Siska Addendum Archaeology Survey of the Proposed Island Expressway Bridge Replacement Project No.: CSBRG-0007-00(128)

The project proposes to construct two new, high level, fixed span, and multi-lane bridges over the Wilmington River (Atlantic Intracoastal Waterway) approximately 0.3 mile east of the city limit of Savannah along the Islands Expressway (CR 787) in Chatham County, Georgia.

Chatham 2017
9710 Perrine, Wesley A. Phase I Archaeological Survey for the Installation of High Mast Lighting at the Interchange of Interstate 59 and State Route 136, Dade County, Georgia

The purpose of this project is to install new high mast lighting at the interchange of Interstate 59 (I-59) and State Route (SR) 136 in the city of Trenton, Georgia (Figure 1).

Dade 2017
9711 Pietak, Lynn Marie Phase I Archaeological Survey for Enhanced Sidewalk and Intersection Improvements on Barnwell Road, Fulton County, Georgia

The Barnwell Road Enhanced Sidewalk and Intersection Improvements project consists of the addition of a 10-foot wide sidewalk along the western side of Barnwell Road from Holcomb Bridge Road to just south of Niblick Drive. A pedestrian bridge will be included for the Hogan Creek crossing.

Fulton 2017
9712 Cowie, Sarah Ground Plan: Phase II Archaeological Testing and Limited Phase III Data Recovery of the Ochillee Creek Site (9Ce379) Fort Benning, Chattahoochee County, Georgia

This report describes Phase II archaeological testing and limited Phase III data recovery of an archaeological site on Fort Benning in Georgia.

Chattahoochee 2001
9713 Renaud, Lindsey Phase l Archaeological Survey for Hurricane Matthew Emergency Repairs Along SR 204, Chatham County, Georgia

The proposed project PI #0015387, approximately ten miles southwest of Savannah, would make general repairs to facilities along SR 204 that were damaged by Hurricane Matthew in October 2016.

Chatham 2017
9714 McCarley, Billy J. Addendum Phase I Archaeological Survey of the Proposed Redmond 2 Telecommunications Facility in Cedartown Polk County, Georgia

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the proposed Redmond 2 telecommunication facility on November 7, 2016.

Polk 2017
9715 Keith, Scot J. Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 195-5042-0, Transco Road over Scull Shoal Creek, Madison County

This project involves the replacement of Bridge 195-5042-0 that carries Transco Road over Scull Shoal Creek in Madison County (Attachment 1). The bridge, built in 1966, is located approximately 6.5 miles northeast of Danielsville, Georgia.

Madison 2017
9716 Keith, Scot J. Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 005-5010-0, Liberty Church Road over Little Hurricane Creek, Bacon County

This survey is a part of the GDOT Low Impact Bridge Program (LIBP). From the LIBP Manual: "The 100-foot expanded archaeology survey corridor on typical GDOT projects will be waived in some instances, given that projects in the Program are not intended to extend beyond existing ROW.

Bacon 2017