Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
9666 Weed, Carol S. Addendum to the Phase I Report for the Proposed Bridge Replacement Carrying US 411/SR 61 over the CSX Bridge, Murray County, Georgia

The project was originally surveyed by GT Hill Planners in 2013 (Koch 2013).

Murray 2016
9667 Carlock, Michael D. First Addendum to Phase I Archaeological Survey for Downtown Griffin Pedestrian and Bicycle Facilities, Spalding County, Georgia

The proposed project is located on Hill Street from Poplar Street to Tinsley Street, on Solomon Street from 9th to 3rd Streets, and on 5th Street from Solomon to Taylor Streets (Figures 1 and 2).

Spalding 2016
9668 Carlock, Michael D. Fourth Addendum to the Phase I Archaeological Survey of Jeffersonville and Millerfield Road Widening in Bibb County, Georgia

The proposed project in Bibb County, Georgia would widen Jeffersonville Road from a two-lane rural section to a five-lane urban section from Emery Highway (US 23, US Alt 129, SR 19, SR 87) to Boggy Branch, transition to a three lane urban section from Boggy Branch to Emery Road (US 80, SR 57), an

Bibb 2017
9669 Roberts, Joseph Phase I Archaeological Survey for CID Commuter Trails, DeKalb and Fulton Counties, Georgia

The proposed project would construct multi-use commuter trails at two locations in Fulton and DeKalb counties.

DeKalb 2017
9670 Pietak, Lynn Marie Phase I Archaeological Survey of Interstate Bridges on Interstate 20 in Greene, Morgan, Newton and Taliaferro Counties, and on Interstate 16 in Laurens County, Georgia

The project involves bridge rehabilitation work on eleven (11), bridge structures on Interstate (I) 20 and I-16 as described below:

Greene 2017
9671 Jackson, Paul D. A Phase I Cultural Resource Survey For The Proposed GADOT South Calhoun Bypass Pipeline Lowering Project (AFE 207775) Gordon County, Georgia

TerraXplorations, Inc.

Gordon 2016
9672 Williams, Siska Addendum Archaeology Survey of State Route (SR) 49 from Felton Drive to US 441/SR 29

This project consists of the widening and reconstruction of SR 49 from Felton Drive and ending at US 441/SR 29, from a two-lane facility to a four-lane facility with a 14' flush median.

Baldwin 2017
9673 Trudeau, Mary F. Addendum Phase I Survey of the Proposed Improvements to Douthit Ferry Road, Bartow County, Georgia

In September 2016, Edwards-Pitman Environmental, Inc. (EPEI) conducted an addendum Phase 1 archaeological survey for the proposed improvements to Douthit Ferry Road in Bartow County (Georgia Department of Transportation [GDOT] Project STP-0007-00(494), P.I. No.

Bartow 2017
9674 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Early Acquisition Parcel for I-85/McGinnis Ferry New Interchange, Gwinnett County, Georgia

Early acquisition parcels, as they pertain to Federal Highway Administration (FHWA) projects, are sections of land that lie within proposed Right-of-Way (ROW).

Gwinnett 2017
9675 Perrine, Rachel Phase I Archaeological Survey of Emergency Repair Project to Replace Traffic Signal Poles at the Intersection of State Route 25 Spur and Glynco Parkway, Glynn County, Georgia

In October 2016, Hurricane Matthew displaced traffic signal concrete strain poles and damaged signal heads at two locations at the intersection of State Route (SR) 25 Spur/Golden Isles Parkway and Glynco Parkway in Brunswick, Glynn County, Georgia (Figure 1).

Glynn 2017