Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
9656 Keith, Scot J. Addendum: Phase I Archaeological Survey of an 18-Acre Section of the Pierpont Mitigation Tract Site Bulloch County, Georgia

New South Associates has completed an archaeological survey of an approximately 18-acre section of the Pierpont Mitigation Tract site (Oliver Bridge Wildlife Management Area) east of Statesboro, Georgia in response to a request from Georgia Southern University (Georgia Southern).

Bulloch 2015
9657 Trudeau, Mary F. Phase I Archaeological Survey of Improvements to SR 5/Bill Arp Road, CR 198/Banks Mill Road, CR 174/Dorsett Shoals Road, Pool Road, and Big A Road, Douglas County, Georgia

Edwards-Pitman Environmental, Inc.

Douglas 2017
9658 Keith, Scot J., McQuinn, Corey, Matternes, Hugh B., Lowry, Sarah Phase I Archaeological Survey of Intersection Improvements at Nine Locations, Ralph D. Abernathy Boulevard (SR 139) and Joseph E. Lowery Boulevard

This project would mostly be completed within existing right-of-way (ROW), although there is a potential for small areas of required ROW or easement to add traffic control equipment such as pedestal poles or conduits.

Fulton 2017
9659 Keith, Scot J. Phase I Archaeological Survey of Proposed Replacement of Bridge 109-0013-0 at SR 169 and Bull Creek in Evans County, Georgia

This project involves the replacement of Bridge 109-0013-0, which carries SR 169 over Bull Creek in Evans County, Georgia. The proposed project would replace an existing, non-historic, structurally deficient two-lane bridge.

Evans 2017
9660 Renaud, Lindsey Phase I Archaeological Survey for Brookhaven Intelligent Transportation Systems (ITS) Upgrades

The proposed project would consist of the installation of fiber optic communication devices along approximately 5 miles of roadway (see Figure 1).

DeKalb 2017
9661 Roberts, Joseph Addendum Survey for the Phase I Archaeological Survey for the Proposed Widening of SR 120/Abbotts Bridge Road, Fulton and Gwinnett Counties, Georgia

The proposed GDOT Project would widen SR 120/Abbotts Bridge Road from SR 141/Medlock Bridge Road to Peachtree Industrial Boulevard from two through lanes to four through lanes.

Fulton 2017
9662 Williams, Siska Maintenance Activities on State Route (SR) 85 from SR 22 Connector to SR 1 in Muscogee County, Georgia

The proposed project would consist of maintenance activities along a 3.467 mile section of SR 85 in Muscogee County from the SR 22 Connector to SR 1 (MP 0.00 – MP 3.494).

Muscogee 2016
9663 Carlock, Michael D. Phase I Archaeological Survey of Proposed Maintenance Improvements along SR 41 from SR 85 to SR 18 in Meriwether County, Georgia

The proposed work consists of milling, patching, resurfacing, striping, raised pavement markers, four foot earth shoulder filling, and curb cuts (Table 1) for the installation of wheelchair ramps along a 11.438 mile section of SR 41 in Meriwether County, Georgia from SR 85 to SR 18 (MP 0.669- 12.

Meriwether 2016
9664 Blackwelder, Jon R. Second Addendum to Phase I Archaeological Survey for the Proposed Widening of Spout Springs Road, Hall County, Georgia

The complete Spout Springs widening project was designed under P.I. No. 0009679.

Hall 2016
9665 Quirk, Phillip W. Phase I Archaeological Survey for SR 32 over 17 Mile River and Otter Creek Bridge Replacements, Coffee County, Georgia

On May 9- 12, 2016, EPEI conducted a Phase I archaeological survey for the proposed SR 32 over 17 Mile River and Otter Creek bridge replacement project (P.I. Nos. 0011678 and 00 11679), in Coffee County, Georgia (Figure 1.1 ).

Coffee 2017