Back to top

Quirk, Phillip W.

Report Number Author(s) Title Abstract Summary County Year
9589 Quirk, Phillip W. Second Addendum to Archaeological Survey of Sandy Springs Circle Streetscapes, Fulton County, Georgia

The proposed project consists of streetscape improvements and a road diet along Sandy Springs Circle in the City of Sandy Springs, Fulton County, Georgia. The project would extend along Sandy Springs Circle from south of Hammond Drive to Mt. Vernon Highway.

Fulton 2017
9665 Quirk, Phillip W. Phase I Archaeological Survey for SR 32 over 17 Mile River and Otter Creek Bridge Replacements, Coffee County, Georgia

On May 9- 12, 2016, EPEI conducted a Phase I archaeological survey for the proposed SR 32 over 17 Mile River and Otter Creek bridge replacement project (P.I. Nos. 0011678 and 00 11679), in Coffee County, Georgia (Figure 1.1 ).

Coffee 2017
9694 Quirk, Phillip W. Phase I Archaeological Survey for Bridge 273-5025-0, John Fox Road over Walk-ikey Creek, Terrell County, Georgia

The Georgia Department of Transportation (GDOT) has developed a Low Impact Bridge Program (LIBP) to provide expedited project delivery for the least complicated type bridge replacement projects.

Terrell 2016
9701 Quirk, Phillip W. Phase I Archaeological Survey for SR 32 Over Bear Creek Bridge Replacement, Coffee County, Georgia

The project is located in Coffee County approximately 1.2 miles west of Nicholls, Georgia, and consists of replacing a structurally deficient bridge on SR 32 over Bear Creek (Structure ID #069- 00 17 -0).

Coffee 2016
9704 Quirk, Phillip W. Third Addendum Phase I Survey for an Interchange Improvement at Interstate 75 and County Road 274/Bellville Road, Lowndes County, Georgia

The 1-75 and CR 274/Bellville Road interchange would continue as a rural diamond interchange. The proposed bridge would be offset 24 feet to the south of the existing location to accommodate staging of construction.

Lowndes 2017
9859 Quirk, Phillip W. ADDENDUM TO THE PHASE I ARCHAEOLOGICAL SURVEY OF THE PROPOSED SR 66 OVER BRASSTOWN CREEK IMPROVEMENTS AND PHASE II TESTING OF THE HIGH BANK SITE (9TO20), TOWNS COUNTY, GEORGIA. GDOT PROJECT NO. BR-0000-00[304], P.I. NO. 0000304 HP. NO. 010525-005

This addendum report addresses design changes made in 20 17 to the proposed bridge replacement and right-of-way (ROW) realignment of State Route (SR) 66 over Brasstown Creek project (Georgia Department of Transportation [GDOT] Project BR-0000-00[304], P.I. No.

Towns 2017
9930 Quirk, Phillip W., Baughman, Pamela J. Addendum to Phase I Archaeological Survey of the I-285 at Bouldercrest Road Interchange, DeKalb County, Georgia

Georgia Department of Transportation (GDOT) Project IMNH0-0285-01(352), PI No.

DeKalb 2017
9945 Webb, Robert S., Quirk, Phillip W. PHASEICULTURALRESOURCESSURVEY OF THE HORIZON 400 TRACT GWINNETT COUNTY, GEORGIA

During June 2017, R.S. Webb & Associates conducted a cultural resources Literature review and a Phase I cultural resources field survey of the proposed Horizon 400 tract in Gwinnett County, Georgia.

Gwinnett 2017
10083 Quirk, Phillip W., Moss, Richard A. PHASE I ARCHAEOLOGICAL SURVEY FOR FY 16 DESIGN BUILD REPLACEMENT PROJECTS - BATCH 3, COWETA, CRAWFORD, HARRIS, MARION, MERIWETHER, AND PIKE COUNTIES, GEORGIA GDOT P.I. NO. 0014176, GP NO. 151221-001

On December 15, 2015, Edwards-Pitman Environmental, Inc. (EPEI), conducted a Phase I archaeological survey for Fiscal Year (FY) 16 Design Build Replacement Projects-Batch 3 (P.I. No. 0014176, GP No.

Coweta 2016
10096 Quirk, Phillip W. Phase I Archaeological Survey for Intersection Improvements for I-75 @ 2 Locations, SR 8 @ 4 Locations, SR 10 @ 2 locations, and SR 42 @ 1 Location, Fulton County, Georgia

The proposed project would consist of the improvement of nine (9) intersections in the City of Atlanta in Fulton County (see Figure 1).

Fulton 2017
Displaying 91 - 100 of 117