12101 Alston, Robert L. Archaeological Survey of Project I-75-1(100), Dooley-Houston Counties

Please advise the GDOT Archaeologist as to whether these projects will be on new or existing alignment. Plan and profile sheets should be forwarded to the archaeologist if available.

Dooly County, GA 1980
12102 Erickson, Luke W. Archeological Assessment of a Meriwether County Resurfacing Project, CSSTP-M003-00(450)

This project consists of the resurfacing, milling, and shoulder building beginning of SR 54 Spur beginning at M.P. 0.00 and ending at M.P. 0.15. All work will take place within the existing right-of-way with no new right-of-way required. Total project length is approximately 0.15 mile.

Meriwether County, GA 2006
12103 Erickson, Luke W. Archeological Assessment of a Meriwether/Coweta County Resurfacing Project, CSSTP-M003-00(449)

This project consists of the resurfacing, milling, leveling, patching, and shoulder building of ST 41 beginning at MP 16.29 in Meriwether County and ending at MP .08 in Coweta County. All work will take place within the existing right-of-way with no new right-of-way required.

Meriwether County, GA 2006
12104 D'Avino, Gail A., Entorf, Bob P. Project IM-75-2(208) Bibb/Monroe Counties, Determination of No Undertaking for History and Archaeology

Project IM-75-2(208), Bibb/Monroe County: Determination of No Undertaking for History and Archaeology. The subject project would consist in the concrete rehabilitation of I-75 in Bibb County and Monroe County.

Bibb County, GA 1997
12105 D'Avino, Gail A., Entorf, Robert F. Project IM-STP-00MS(203) Barrow/Gwinnett Counties, Proposed Bridge Painting

Project IM-STP-00MS(203), Barrow/Gwinnett Counties: Proposed Bridge Painting; the proposed project consists of the painting of bridges at seventeen locations (see attached list) .

Barrow County, GA 1997
12106 Erickson, Luke W. Archeological Assessment of a Houston County Resurfacing Project, CSSTP-M003-00(448)

This project consists of the resurfacing, milling, leveling, patching, and shoulder building of SR 11 beginning at M.P. 23.76 and ending at M.P. 27.40. All work will take place within the existing right-of-way with no new right-of-way required. Total project length is approximately 3.64 miles.

Houston County, GA 2006
12107 Anderson, Nain E. Archaeological Survey Report of APL-8019(1), Carroll County

This project involves the construction of a two lined facility from the intersection of S.R. 61 and U.S. 78 north .83 miles. The study corridor continues to S.R. 101. 300 feet of right-of-way will be needed. The construction will be on the right side of the right-of-way. No sites were located.

Carroll County, GA 1977
12108 Moore, Sherry Fleming, Entorf, Bob P. Archaeological Assessment of Project STP-005-4(26), Emanuel County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project STP-005-4(26), Emanuel County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NR

Emanuel County, GA 1999
12109 Rotenstein, David S. Archaeological Assessment of Project FR-164-1(13), Fayette County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project FR-164-1(13), Fayette County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP

Fayette County, GA 1985
12110 Hart, Barry D. Archaeological Assessment of Project BRMLB-3710(3), Floyd County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project BRMLB-3710(3), Floyd County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP)

Floyd County, GA 1984