Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
12097 Erickson, Luke W. Archeological Assessment of a Coweta County Resurfacing Project, CSSTP-M003-00(490)

This proposed project consists of the milling, patching, leveling, shoulder paving and resurfacing of SR 14 beginning at the Coweta/Troup County Line and ending at SR 41/US 27 Alternate. All work will take place within the existing right-of-way, with no new right-of-way required.

Coweta 2006
12098 Maxwell, Jayne Project M-1423(1) Laurens County

Project M-1423(1), Laurens County: this transportation project has been surveyed for historic resources in compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto. The project consists of relocating S.R. 31 (U.S.

Laurens 1981
12099 Malphurs, Peter Project RS-2933(1) and M-1924(1) Laurens County

RS-2933(1) and M-1924(1), Laurens County: This transportation project has been surveyed for historic resources in compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto.

Laurens 1981
12100 Larson, Lewis H. Project F-105-1 Coffee County

Project F-105-1 located in Coffee County is the paving of 8.5 miles of Secondary Route 1142 in Coffee County. There is no evidence that any archaeological sites will be disturbed.

Coffee 1974
12101 Alston, Robert L. Archaeological Survey of Project I-75-1(100), Dooley-Houston Counties

Please advise the GDOT Archaeologist as to whether these projects will be on new or existing alignment. Plan and profile sheets should be forwarded to the archaeologist if available.

Dooly 1980
12102 Erickson, Luke W. Archeological Assessment of a Meriwether County Resurfacing Project, CSSTP-M003-00(450)

This project consists of the resurfacing, milling, and shoulder building beginning of SR 54 Spur beginning at M.P. 0.00 and ending at M.P. 0.15. All work will take place within the existing right-of-way with no new right-of-way required. Total project length is approximately 0.15 mile.

Meriwether 2006
12103 Erickson, Luke W. Archeological Assessment of a Meriwether/Coweta County Resurfacing Project, CSSTP-M003-00(449)

This project consists of the resurfacing, milling, leveling, patching, and shoulder building of ST 41 beginning at MP 16.29 in Meriwether County and ending at MP .08 in Coweta County. All work will take place within the existing right-of-way with no new right-of-way required.

Meriwether 2006
12104 D'Avino, Gail A., Entorf, Bob P. Project IM-75-2(208) Bibb/Monroe Counties, Determination of No Undertaking for History and Archaeology

Project IM-75-2(208), Bibb/Monroe County: Determination of No Undertaking for History and Archaeology. The subject project would consist in the concrete rehabilitation of I-75 in Bibb County and Monroe County.

Bibb 1997
12105 D'Avino, Gail A., Entorf, Robert F. Project IM-STP-00MS(203) Barrow/Gwinnett Counties, Proposed Bridge Painting

Project IM-STP-00MS(203), Barrow/Gwinnett Counties: Proposed Bridge Painting; the proposed project consists of the painting of bridges at seventeen locations (see attached list) .

Barrow 1997
12106 Erickson, Luke W. Archeological Assessment of a Houston County Resurfacing Project, CSSTP-M003-00(448)

This project consists of the resurfacing, milling, leveling, patching, and shoulder building of SR 11 beginning at M.P. 23.76 and ending at M.P. 27.40. All work will take place within the existing right-of-way with no new right-of-way required. Total project length is approximately 3.64 miles.

Houston 2006