Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
12087 D'Avino, Gail A., Entorf, Bob P. Project STP-007-1(66) Decatur County, Determination of No Undertaking

Project STP-007-1(66), Decatur County: of No Undertaking Determination; the subject project would consist of leveling and surfacing of SR 1 Business in the city of Bainbridge.

Decatur 1997
12088 Falvey, Lauren W. Sixth Addendum Phase I Archaeological Survey for the City of Cleveland Western Bypass, White County, Georgia

The proposed project is Phase III of the West Cleveland Bypass project in White County, Georgia. The larger project proposed to construct a bypass along a new location corridor and existing roadway.

White 2018
12089 Webb, Robert S. Phase I Archaeological Resources Survey Proposed WRDW Communications Facility 2801 Riverwatch Parkway Augusta, Richmond County, Georgia TCNS NO. 183432

The proposed WRDW communications compound is located at 2801 Riverwatch Parkway in Augusta, Richmond County, Georgia (Martinez, Georgia/South Carolina 7 .5-minute USGS Quadrangle) (Figure 1; see Attachment No. l for project figures).

Richmond 2019
12090 Moore, Sherry Fleming, D'Avino, Gail A. Project IM-16-1(129) Statewide County, Determination of No Undertaking

Project IM- 16-1(129), Statewide County: Determination of No Undertaking The subject project would consist of the repairing of 15 interstate bridges throughout the state. Repairs would include epoxy injection into cracks, patching concrete, and/or fiber reinforced polymer additions.

DeKalb 1999
12091 D'Avino, Gail A., Entorf, Bob P. Project STPN-007-2(40) Brooks County, Determination of No Undertaking

Project STPN-007-2(40), Brooks County: Determination of No Undertaking; the subject project would consist of leveling and resurfacing of SR 38/ US 84 in Brooks County.

Brooks 1997
12092 Carr, Randall Conceptual Stage Study PPL-32(56) Irwin/Coffee Counties, PI # 421343

Project PPL-32(56) Irwin-Coffee Counties will displace approximately one (1) owner occupied single family residence (white). The only other structures within the required right of way involve two (2) storage buildings and would require only a possible moving payment of personal items.

Irwin 1991
12093 Moore, Sherry Fleming, D'Avino, Gail A. Project IM-00MS(413) Catoosa/Whitfield Counties, Determination of No Undertaking

The subject project would consist of the removal and replacement of various joint systems at eight bridge locations along 1-75 in Catoosa and Whitfield Counties. The proposed project would consist of the bridges at the following locations:

Whitfield 1999
12094 D'Avino, Gail A., Entorf, Bob P. Project STPM-005-5(40) Bulloch, Determination of No Undertaking for History and Archaeology

Project STPM-005-5(40), Bulloch County: Determination of No Undertaking for History and Archaeology. The subject project would consist of the leveling and resurfacing of SR 26 beginning at CS 671/Savannah Avenue (M.P.

Bulloch 1996
12095 D'Avino, Gail A., Entorf, Bob P. Project STP-001-5(57) Fulton County, Determination of No Undertaking for History and Archaeology

Project STP-001-5(57), Fulton County: Determination of No Undertaking for History and Archaeology.

The subject project would consist of the leveling and resurfacing of Northside Parkway (US 41/SR 3) from

Fulton 1996
12096 Erickson, Luke W. Archeological Assessment of a Floyd County Resurfacing Project, CSSTP-M003-00(454)(455)

This proposed project consists of resurfacing two roads in Floyd County. P.I. M003454 is the milling, leveling, resurfacing, and earth shoulder reconstruction of SR 1 LP beginning at SR 20 and ending at SR 1, a distance of 8 miles. P.I.

Floyd 2006