Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
1331 Smith, Greg C., Chance, Marsha A. An Intensive Archaeological Survey of the Proposed St. Simons Island School Property, Glynn County, Georgia

In December 1992 an intensive archaeological survey was conducted of a 20.1-acre tract located one-half mile east of Fort Frederica on St. Simons Island, Georgia.

Glynn 1993
1332 Watts, Gordon P. Remote Survey and Low Water Survey, Back River and New Cut, Chatham County, Georgia and Jasper County, SC

The U. S. Army Corps of Engineers, Savannah District has proposed dosing New Cut between Back and Middle Rivers and locking open the tide gate at Hutchinson Island on the Back River in Savannah Harbor.

Chatham 1995
1333 Ashley, Keith H., Chance, Marsha A. An Archaeological Survey of the US 27 Widening Project LaGrange to the Roopville Bypass

An archaeological assessment survey was conducted by Environmental Services, Inc. (ESI) of a segment of U.S. 27 through Troup, Heard, and Carroll Counties, Georgia, between December 1993 and February 1994.

Carroll 1995
1334 Johnson, Christy, Ross, H. R. Rocky Mountain Project Cultural Resource Investigations at the Rocky Mountain Project (1978-1988)

The Rocky Mountain Project is located in Floyd County, Georgia, 12.5 kilometers northwest of the City of Rome (Figure 1.0). The project area is in a valley bounded by Simms Mountain on the north and Lavender Mountain on the south.

Floyd 1990
1335 Cantley, Charles E., Elliott, Rita F. Archaeological Survey of SR21 from Shawnee to Sylvania

During the months of May and July, 1994, New South Associates, Inc. conducted a 20.6 mile survey of SR 21 in Effingham and Screven Counties. Survey also included an additional area along the periphery of a Carolina Bay in Screven County.

Effingham 1994
1336 Technical Proposal for a Cultural Management Effects Mitigation, Rocky Mountain Pumped Storage Generating Station, Floyd County, Georgia and Amendment: Review and Secondary Inquiry Ferc No. 2725

None Present.

Floyd 1983
1337 Ottesen, Ann I., Riordan, Timothy B. Report on Investigations Phase I Research and Recovery Program for Historic Resources Cultural Resources Effects Mitigation Plan, Rocky Mountain Pumped Storage Project, Floyd County, Georgia

This report details the results of Phase I of a multi-disciplinary and interdiscipilinary cultural resources investigation at the Rocky Mountain Pumped Storage Project, (RMP) Floyd County, Georgia.

Floyd 1986
1338 Ottesen, Ann I., Riordan, Timothy B. Report on Investigations Phase I and II, Tasks 1 and 2 Research Recovery Program for Historic Resources Cultural Resources Mitigation Rocky Mountain Pumped Storage Project, Floyd County, Georgia

This volume presents the documentary sources reviewed during Phase I and Phase II, Tasks 1 and 2 of the Research and Recovery Program for Historic Resources for the Rocky Mountain Pumped Storage Project.

Floyd 1986
1339 Ottesen, Ann I., Riordan, Timothy B. Report on Investigations Phase I and II, Research and Recovery Program for Historic Resources Cultural Resources Effects and Mitigation Rocky Mountain Pumped Storage Project, Floyd County, Georgia

None Present.

Floyd 1985
1340 Ottesen, Ann I., Riordan, Timothy B. Report on Investigation Phase II, Task 1 and 2, Research and Recovery Program for Historic Resources Cultural Resource Effects Mitigation Plan Rocky Mountain Pumped Storage Project, Floyd County, Georgia

This report details the results of Phase II, Task 1 and 2, Research and Recovery Program for Historic Resources at the Rocky Mountain Pumped Storage Project (RMP) in Floyd County, Georgia.

Floyd 1986