Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
4547 Pietak, Lynn Marie Phase I Archaeological Survey for Intersection Improvements to Walt Banks Road at North Peachtree Pky

The proposed project would consist of improvements to the intersection of CS 303/Walt Banks Road and CS 340/Peachtree Parkway in Peachtree City, Fayette County, Georgia.

Fayette 2008
4548 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Holcomb Bridge & Alpharetta Highway

The original project limits on SR 9 were from Mansell Circle to Commerce Parkway, approximately 0.7 mile. The original limits on SR 92 were from Mansell Road Extension to Roswell Mall, approximately 0.64 mile. The total project length was 1.34 miles.

Fulton 2009
4549 Gale, Sara H. Archaeological Assessment of Project CSSTP-0006-00(864), Fulton County

The proposed project would improve the safety of the five leg intersection of State Route (SR) 154 at Cedar Grove Road and Ridge Road. The existing two lane section of SR 154 would be widened to include a 14-ft. flushed median.

Fulton 2009
4550 Mustonen, Heather Archaeological Assessment of Project MSL-0003-00(542), Clayton County

The proposed project would consist of the construction of a new GRTA Xpress Operating Facility on approximately 10 acres of land located in Clayton County.

Clayton 2009
4551 Lotti, Teresa Ann Archaeological Reassessment of Project STP00-000S-00(014), Newton County

Project STPOO-OOOS-00(014) would consist of symmetrical widening of State Route 142 bridge over 1-20 in Newton County. The project was surveyed twice, once by Rick Richardson in 1999 and once by Eric Duff in 2005 (HPD# HP980923-002).

Newton 2006
4552 Lotti, Teresa Ann Archaeological Assessment of Project CSSTP-0007-00(362), Baldwin County

CSSTP-0007-00(362) would consist of upgrading traffic signals at 3 locations in Baldwin County to improve traffic flow. The new traffic signals will be installed at the following intersections: SR 243/S. Wayne Street at W. Andrews Street, SR 243/S.

Baldwin 2009
4553 Silliman, Garrett W. 2nd Adden. To the Phase I & II Arch. Investigations of the Proposed Ball Street Extension

Original Project Description: The proposed project involves the extension of Ball Street for 1.05 miles from Larry Walker Parkway/SR 224 on the south to the intersection with Duncan Avenue on the north.

Houston 2009
4554 Smith, Patrick Revised Phase I Archaeological Survey of the Proposed Improvements at Intersection of SR 155 and Fairview Road in Henry and Rockdale Counties, Georgia

The proposed intersection improvement is part of Henry County's Special Purpose Local Option Sales Tax (SPLOST) program.

Henry 2009
4555 Reynolds, Michael W., Whitley, Thomas G. Archaeological Survey of the SR 156 (Red Bud Road)/College Street (CS 782) Intersection Addendum

Changes to the project include changes to the amount of right-of-way (ROW) required for the project and changes to the proposed culvert carrying Stream I under College Street/CS 782.

Gordon 2009
4556 Silliman, Garrett W. Phase I Archaeological Survey of the Proposed Yellow River Trail Project Area

The total length of the proposed Turkey Creek/Yellow River Multi-Use Trail would be 4.75 miles, and consist of a 10-foot wide asphalt trail and grassed shoulders. The trail would begin within Turner Park.

Newton 2008