Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
4527 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Sandy Springs Circle Project Area, Fulton County, Georgia

Project limits have increased by approximately 267 feet (0.05 mile). The previous limits included approximately 1,762 feet along Sandy Springs Circle and 1,507 feet on Hammond Drive, for a total project length of approximately 3,269 feet (0.62 mile).

Fulton 2009
4528 Johnson, Pamela A. Archaeological Reassessment of Project CSSFT-0007-00(477), Colquitt County

The proposed project would consist of safety improvements to the intersection of SR 133, SE 5th Avenue, Industrial Drive, and Old Adel Road, just east of the city of Moultrie, in Colquitt County, Georgia.

Colquitt 2009
4529 Mustonen, Heather Archaeological Assessment of Project STP-0000-00(833), Laurens County

The proposed project would consist of the construction of a new roadway and bridge over the Oconee River north of the city of Dublin in Laurens County. County Road 454/Country Club Road (MP 3.46) would be extended along CR 732Blackshear Ferry Road to CR 8/Ben Hall Lake Drive (MP 0.93).

Laurens 2008
4530 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of the Sigman Rd. and East View Dr. Intersection Improvements Project

Description from December 21, 2006 PCE: The proposed project would extend approximately 480 feet north and approximately 570 feet south of the SR 20/Sigman Road and Eastview Road intersection on SR 20/Sigman Road.

Rockdale 2008
4531 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 20 and West Hightower Trail Intersection Improvements

Along State Route (SR) 20 (Loganville Highway), from approximately 725 feet south of West Hightower Trail to approximately 700 feet north of West Hightower Trail, for a total distance of approximately 0.27 miles, and along West Hightower Trail from approximately 735 feet west of SR 20 to approxim

Rockdale 2008
4532 Mustonen, Heather Archaeological Reassessment of Projects BR-003-00(452) and CSSFT-0008-00(400), Walker County

The proposed project would replace two bridges on Happy Valley Road/CR 835 over Chattanooga Creek, 4.20 miles southwest of the City of Rossville, Walker County, Georgia. In addition, the intersection of CR 835/Happy Valley Road and SR 193 would be improved including the installation of a signal.

Walker 2008
4533 Silliman, Garrett W. Phase I Archaeological Survey of the Proposed Improvements to Jimmy DeLoach Pkwy at US 80

The existing southern terminus of Jimmy DeLoach Parkway forms an at-grade T intersection with US 80. The intersection of US 80 and Jimmy DeLoach Parkway will be signalized with the Jimmy DeLoach Phase II extension project.

Chatham 2008
4534 Johnson, Pamela A. Archaeological Survey of Project I-85-2(17), Jackson County

The proposed project would surplus Parcel 13 on 1-85 in Jackson County (see attached location map and graphic). The parcel is located west of 1-85 and north of SR 82/Holly Springs Road, along the 1-85 southbound exit ramp. The parcel is approximately 1.224 acres.

Jackson 2008
4535 Mustonen, Heather Archaeological Assessment of Project STP-0062-01(025), Wilkinson County

The proposed project originally consisted of intersection improvements at State Route 57 and State Route 18 including the realignment and correction of substandard curves on the south, east and west approaches. Approximately 100-200' of right-of-way was required.

Wilkinson 2008
4536 Stoops, Richard W. Phase I Archaeological Survey for Lanes Bridge Road (GA 169), Wayne County, Georgia

The project area is located in the northwest section of Jesup, Georgia. It is a rerouting of Lanes Bridge Road (GA 169) between the intersections with Spring Grove Road and West Cherry Street, passing over the Norfolk Southern Railroad line.

Wayne 2008