Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
4487 Hammack, Stephen A. Phase I Archaeological Survey Roberta Walking Trail, Crawford County, Georgia

The proposed project would consist of the construction of the Roberta Walking Trail on South Matthews Street. The project corridor extends approximately 0.46 mile along South Matthews Street between SR 42/East Agency Street and the city cemetery.

Crawford 2009
4488 Silliman, Garrett W. 3rd Addendum to the Phase I Archaeological Survey of Flakes Mill Rd. over the South River, DeKalb County

The project description contained within the May 1, 2006 approved Programmatic Categorical Exclusion and subsequent reevaluations (January 2007 and October 2007) described the project as follows: The proposed roadway typical sections would consist of two 12 foot travel lanes, one 12 foot center t

DeKalb 2009
4489 Pietak, Lynn Marie Phase I Archaeological Survey of the I-75/SR 401 Widening From SR 155 to SR 138, Henry Co., GA

The proposed project involves the addition of one lane within the existing median for both southbound and northbound 1-75 in Henry County making the existing six-lane roadway an eight lane facility.

Henry 2009
4490 Lotti, Teresa Ann Archaeological Reassessment of Project BR-0001-00(364), Tattnall County

Project BR-0001-00(364) would replace the SR 56 bridge over the Ohoopee River in Tattnall County, Georgia. This project was surveyed in 2004 by Teresa Lotti (HP040218-003).

Tattnall 2009
4491 Johnson, Pamela A. Archaeological Reassessment of Project CSHPP-0007-00(547), Henry County

The project as originally proposed would improve the intersection of State Route 81 and Lake Dow Road by re-aligning Lake Dow Road approximately 1215-ft.

Henry 2009
4492 Silliman, Garrett W. Phase I Archaeological Survey of the Noonday Creek Multi-Use Trail, Phase 1b (CSTEEE-008-00(102), P.I. 0008102)

The proposed trail is located along the south side of Old Highway 41 in Cobb County, outside the City of Marietta (Figure 1). The project is located entirely on the Marietta USGS Quadrangle (Figure 2).

Cobb 2009
4493 Pietak, Lynn Marie Archaeological Survey of Jimmy Carter Blvd. and Singleton Rd. Intersection Improvements

The proposed design improvement for Jimmy Carter Boulevard at Singleton Road's westbound approach includes an additional left-turn lane (creating dual left-turn lanes) and a dedicated right-turn lane.

Gwinnett 2009
4494 Pietak, Lynn Marie Phase I Archaeological Survey of the Hewatt Road to Britt Drive Connector Road

The project proposes to construct a connector street from Hewatt Road to Britt Drive in order to provide access to property owners and remove commercial traffic from US 78.

Gwinnett 2009
4495 Silliman, Garrett W. Phase I Archaeological Survey for the Proposed Torras Causeway Safety Improvements

The proposed project on SR 25 Spur East/Torras Causeway would begin east of the intersection with SR 25/US 17/Ocean_ Highway and would continue to just west of CR 584/Kings Way on St. Simons Island. The total project length would be approximately four miles.

Glynn 2009
4496 Pietak, Lynn Marie Covington Highway Widening from DeKalb Medical Parkway to Cragstone Court

The project proposes to widen Covington Highway/US 278/SR 12 from a four-lane section to a five-lane section from DeKalb Medical Parkway to Cragstone Court. The roadway would receive two through lanes in each direction and a center bi-directional left turn lane.

DeKalb 2009