6285 Babits, Lawrence E., Leach, Ricky Report on Exploratory Excavations Jekyll Island Club Hotel Annex 89

During late July 1989, archaeological exploration and mitigation work was conducted on the site of the proposed Jek:yll Island Club Hotel Annex. This work was mandated because the site was within a National Reigster District and had been previously identified as an archaeological site.

Murray 2003
6286 Wilson, Kristin J. Phase I/II Archaeological investigations at Villa Ospo, The Small Dorm, Crane Cottage, and Cherokee cottage, Jekyll Island historic district.

TRC conducted a combined Phase I survey and Phase II testing project on four tracts inside the Jekyll Island Historic District (ca. 1886-1945) in advance of proposed landscape, parking lot, and roadway improvements.

Murray 1996
6287 Horvath, Elizabeth, Hammersten, Susan Archaeological Investigations Conducted at Fort Frederica National Monument, Glynn county

The Southeast Archeological Center (SEAC) conducted archeological investigations in May 1990 prior to the installation of a new water and sewer system and the placement of a waterline down the center of Broad Street in the old town.

Murray 1993
6288 Smith, Marvin T. Clayton County Project C-13039702; Archaeological Investigations Relative to a Program of Waste Water Treatment Facilities.

The first scientific archeological investigations in recent times

Murray 1977
6289 Blanton, Dennis B. Points of Contact: The Archaeological Landscape of Hernando de Soto in Georgia

Through enhanced investigation of two sixteenth-century Native communities this project sought to better predict the location and character of sites associated with earliest Spanish exploration in the Southeast, specifically those touched by Hernando de Soto's initial 1540 trek through present d

Wilkes 1997
6290 Patch, Shawn M. Archaeological Survey of Project BR-001-00(223), Glynn County

The proposed project would replace the existing structurally deficient bridge on CR 78 over Burnett Creek, located approximately three miles northwest of the City of Brunswick, in Glynn County. The bridge would be built on existing alignment with an offsite detour using local roads.

Wilkes 1990
6291 Entorf, Robert F. Archaeological Survey of Project BRS-1222(6), Clinch County

The proposed project would replace the bridge on SR 177 over Sweetwater Creek. The new bridge would be constructed on the existing alignment. The existing right-of-way is approximately 30.5 m (100 ft).

Wilkes 1990
6292 Entorf, Robert F. Archaeological Survey of Project NH-007-3(29), Cinch county

The proposed project would consist of the leveling and resurfacing of US 84. Also included in this project would be the paving of the existing 0.6 m (2 ft) shoulders. The project would begin approximately 0.3 km (0.2 mi) east of CR 207 and would end at the Clinch/Ware County line.

Wilkes 1987
6293 McIntosh, Paul Archaeological Reassessment of Project EDS-84(20), Clinch County

The proposed project would widen SR 38 from the west city limits of Homerville to approximately 300 feet west of Woodyard Creek. In addition, a 48 foot by 50 foot concrete bridge would be built on the new alignment to span Tatum Creek. Total distance for this section is 1.80 miles.

Wilkes 1984
6294 Fleming, Sherry Archaeological Assessment of Project STP-0568(13), Clinch county

The proposed project would consist of the paving of 0.6 m (2 ft) shoulderss of SR 187 in Clinch County. The proposed project would begin at the northeast end of the bridge over Suwannoochee Creek (MP 0.11) and would end at the pavement joint (MP 10.47) north of CR 40.

Wilkes 1995