6305 Pomfret, James Archaeological Survey of Project NH-75-3(232), Cobb County

The proposed project would construct a new Visitor Information Center/Safety Rest Area in Cobb County, Georgia adjacent to the southbound lanes of 1-75 near the city of Kennesaw. The rest area would encompass an area of approximately 22 acres in size.

Murray 1972
6306 Entorf, Robert F. Archaeological Assessment of Project FR-001-5(34) and (37), Cobb County

The proposed projects would widen S.R.3/U.S.41/Cobb Parkway between northwest Atlanta and Merietta. The combined projects would begin at the intersection of S.R.3/U.S.41 and Paces Mill Road then would proceed northwesterly along S.R.3/U.S.41 to the South 120 Loop.

Murray 1966
6307 Bowen, William R. Archaeology Assessment of Project PEMR-9016(3), Cobb/Fulton Counties

This project proposes to convert to one-way pairs Akers Mill/Powers Ferry Roads from just west of Rottenwood Creek to Northside Drive and North Parkway from just west of Rottenwood Creek to Northside Drive.

Murray 1979
6308 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project DPI-0010(001) Ct. 29, Cobb County

The proposed project would consist of the installation of both aerial and underground communication conduit and fiber optic cable', _and video surveillance cameras along Windy Hill Road.

Murray 1984
6309 Bowen, William R. Archaeological Assessment of Project IR-75-3(165), Cobb County

This is the proposed widening of the south-bound 1-75 Exit Ramp at Windy Hill Road and the attendant lane addition to the mainline.

Gilmer 1985
6310 Bowen, William R. Archaeological Assessment of Project IR-75-3(164) and FR-114-1(63) Loop, Cobb County

This is the proposed widening of S.R. 120 Loop/South Marietta Parkway from 1-75 to Roswell Road and the reconstruction of the I-75/South Marietta Loop interchange. A corridor consistant with the proposed project rights-of-way was surveyed for the entire length of the project.

Gilmer 1984
6311 Entorf, Robert F. Archaeology Assessment of Project IR-75-3(168) and (170), Cobb County

The proposed projects represent the proposed reconstruction and widening of 1-75 from just south of Windy Hill Road northwest to 1-575. A corridor consistant with the proposed projects rights-of-way was surveyed for the entire length of the project.

Murray 1964
6312 Entorf, Robert F. Archaeology Assessment of Project IR-75-3(164), Cobb County

This is the reevaluation of the proposed reconstruction of the I-75/S.R. 120 Loop interchange. A corridor consistent with the proposed project rights-of-way was surveyed for the entire length of the project.

Murray 1963
6313 Fernandez-Sardina, Ricardo Archaeological Evaluation of Project STP-114-1(87), Cobb County

The proposed project would widen State Route 120 LP from approximately 128 meters (420') west of Cole Street to approximately 145 m. (475') east of Cole St., in Marietta. The project would provide left turn lanes east and west bound on S.R. 120 LP onto Cole St.

Douglas 1983
6314 Rotenstein, David S. Archaeological Assessment of Project IR-285-1(171) Cobb County

The purpose of the survey was to locate, identify and evaluate the significance of any archaeological resources within the project corridor.

Morgan 1995