Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
6325 Bowen, William R. Archaeological Assessment of Project F-178-1(21), Cobb/Paulding Counties

This project involves the widening and reconstruction of U.S. 278/S.R. 6 from the proposed terminus of the Dallas Bypass (at C.R. 19 about 1 mile west of S.R.

Dodge 1985
6326 Duff, Eric Anthony Archaeological Assessment of Project STP-9023(3), Cobb County

The proposed project would widen SR 6 Business to provide right and left turn lanes in and out of Powder Springs Road/CR 4510. The project would also realign SR 6 Business so that it intersects Brownsville Road/CR 2118 at 90 degrees.

Wilcox 1985
6327 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-186-1(32)01, Cobb County

The proposed project would consist of the r s rfacing._9f SR 92. The project would begin at the intersection of SR 3, and it will end at Lake Shore Drive in the city of Acworth. All construction will be limited to the existing pavement.

Wilcox 2000
6328 Richardson, Rick R. Archaeological Assessment of Project BRM-9023(2), Cobb County

The proposed project would consist of the removal and replacement of the existing bridge over Powder Springs Creek on SR 6 Business/Powder Springs Road. The existing right-of-way varies from approximately 35.0 m (114 ft) to 50 m (164 ft).

Wilcox 1997
6329 Hart, Barry D. Archaeological Assessment of Project TSAP 120 (42) Cobb county

This is a road widening and improvement project on S.R. 120, from Sewell Mill Road to Johnson Ferry Road. A 110 foot wide corridor was surveyed.

Wilcox 2001
6330 Pomfret, James Archaeological Reevalutation of Project NH-178-1(37), Cobb County

The proposed project would improve the intersections on SR 6/US 278 at Hill Road and Oglesby Road in Cobb County.

Wilcox 2001
6331 Pomfret, James Archaeological Reevaluation of Project NH-178-1(37), Cobb County

The proposed project would improve the intersections on SR 6/US 278 at Hill Road and Oglesby Road in Cobb County.

Wilcox 2002
6332 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project CM-575-1(34), Cobb and Cherokee counties

Project CM-575-1(34) would install fiber optic cables, traffic surveillance and vehicle detection cameras, and changeable message signs on portions of 1-75 and 1-575.

Chattahoochee 1993
6333 Pomfret, James Archaeological Reevaluation of Project BHF-STP-001-5(24), Cobb/Fulton Counties

Originally, the proposed project would widen US 41/SR 3/Northside Parkway from just north of it's intersection with Paces Mill Road in Cobb County to just north of the Mt. Paran Road intersection in Fulton County. Proposed required right-of-way varied from 50-75 feet.

Forsyth 1974
6334 Caldwell, Joseph Ralston Appraisal of the Archaeological Resources of the Clark Hill Reservoir Area

The present survey tested this site in a number of places, under Mr. Caldwell's able direction, and found that the bases of sane of these mounds are still intact.

Columbia 1948