6265 Bowen, William R. Archaeological Assessment of Project FR-009-2(67), Glynn County

This project proposes to widen U.S. 17/S.R. 25 from Golden Is. Pkwy. to Yacht Road, a distance of 3.3 miles, within the existing 200 feet of right-of-way. A survey consistent with the project corridor was conducted for the entire project length.

Glynn 2001
6266 Bowen, William R. Archaeological Assessment of Project BRF-007-4(44), Glynn County

This is a bridge replacement on new location over Jekyll River on S. R. 50/Jekyll Is. Rd. The project is ca. 3/4 mile long and would be constructed south of the present bridge. An area consistent with the project corridor was surveyed.

Glynn 2001
6267 Dreihaup, Larry Early Coordination Request for Project NH-009-12 (60) P.I No. 520890, Glynn County

This is to notify you that the above project may have an adverse effect on one potentially eligible National Register of Historic Places (NRHP) archaeological resource within the proposed project's area of potential environmental effect.

Glynn 2001
6268 Richardson, Rick R. Archaeological Assessment of Project NH-009-2(90), Glynn County

The purpose of the survey was to locate, identify and evaluate the significance of any archaeological resources within the proposed project's area of potential environmental effect.

Liberty 1992
6269 Fernandez-Sardina, Ricardo Archaeological Assessment of Project NH-Im-95-1(141), Glynn and McIntosh counties

The proposed project would replace the existing parallel northbound and southbound bridges located on Interstate 95 over the South Altamaha River and would reconstruct the approaches to these bridges.

Glynn 0
6270 Duff, Eric Anthony Archaeological Assessment of Project IM-95-1(144), Glynn County

The proposed project would consist of building renovations_ and >arki.-ia lot expansions at Rest Area 105 in Glynn County. Rest area 105 is located on the east side of 1-95 between exits 8 and 9 north of Brunswick.

Clayton 2009
6271 Entorf, Robert F. Archaeological Assessment of Project STP-007-4(52), Glynn County

The proposed project consists of resurfacing and shoulder paving on SR 99 in Glynn County. The proposed project would begin at the intersection of US 84 and SR 99 mile post 0.00 and would continue northeasterly on SR 99 to an ending point at SR 32 mile post 6.91.

Fulton 2009
6272 Pomfret, James Archaeological Assessment of Project IM-95-1(160), Glynn County

The proposed project, IM-95-1(160), would connect a water line from Safety Rest Area 105 along Interstate 95 to Glynn County's water system. The water line would run approximately 5 feet south of an existing sewer line and extend from Jetport Road Extension westerly to Interstate 95.

Spalding 2009
6273 Pomfret, James Archaeological Assessment of Project STPN-95-1(66), Glynn county

The proposed project would reconstruct the median crossover on SR 520, 0.33 mile west of 1-95. The left turn lane to 1-95 northbound would also be extended to provide a longer storage lane. The southbound exit ramp would be relocated adjacent to the eastbound ramp.

Glynn 2002
6274 Duff, Eric Anthony Archaeological Assessment of Project NH-IM-95-1(117), Glynn County

Project NH-IM-95-1(117) would widen 1-95 from two northbound and southbound lanes to three lanes in Glynn County. The proposed project on 1-95 would begin at US 341 then continue northerly to an end point at the McIntosh County Line. The existing right-of-way on 1-95 is approximately 300 feet.

Forsyth 2009