Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
9135 Gresham, Thomas H., Ledbetter, Jerald Archeological Survey of the Old US 78 Connector Street Project from Britt Drive to Highpoint Road and Highpoint Road to the Old US 78/Walton Ct. Relocation, Gwinnett County, Georgia

From October 2013 to January 2014, Southeastern Archeological Services, Inc. conducted a Phase I archeological survey of the area of potential effect for the proposed extension of the Northside Collector highway located just west of Snellville in southern Gwinnett County.

Washington 2009
9136 Carbo, Andrew, Moss, Richard A., Pietak, Lynn Marie Phase I Archaeological Survey Of The Proposed SR 42 Spur/McDonough Boulevard SE Bridge Over The Norfolk Southern Railroad, Fulton County, Georgia

Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed bridge replacement at State Route (SR) 42 Spur/McDonough Boulevard over the Norfolk Southern Railway in Fulton County, Georgia (Georgia Department of Transportation [GDOT] P.I. No.

Fulton 1987
9137 Pietak, Lynn Marie Adden. to Phase I Survey for the Proposed Bridge Replacement at CR 467 at Cane Creek

The proposed project is located on CR 467/Bickley Highway at the crossing of Cane Creek in Ware County, Georgia. The proposed project would begin approximately 1,230 feet west of the bridge and end approximately 1,270 feet east of the bridge.

Cherokee 2001
9138 Gantt, Mary Elizabeth Addendum - Phase I Archaeological Resources Survey of Additional Right-of-way and Easements for the Proposed 1-75 and 1-575 HOV Lane Construction - The Northwest Corridor

The Northwest Corridor Project proposes to add reversible managed lanes on 1-75 and 1-575. A single reversible lane will be constructed in the 1-75 median north of the 1-575 split to Hickory Grove Road.

Brooks 2015
9139 Pietak, Lynn Marie Phase I Arch. Survey of US 41/US 76/SR 3/North Dalton Bypass at SR 71, Whitfield County

The proposed project is located on the north side of Dalton in Whitfield County, Georgia. The project would involve intersection improvements to US 41/US 76/SR 3/North Dalton Bypass and SR 71/Cleveland Highway.

Colquitt 2015
9140 Appendix 8 Treatment Plan and Research Design for Data Recovery Excavations at Site 9GW393 (Cumberland Rockshelter), Gwinnett County, Georgia

This document presents a treatment strategy and data recovery plan for addressing the adverse effects that the South Coast pipeline will have on an archaeological site determined to be eligible for listing on the National Register of Historic Places (NRHP).

Dougherty 2015
9141 Joseph, Joseph W. Addendum to the Phase I Archaeological Survey of the CR 183/Plantation Road Bridge

This project investigated two transects along the CR 183/Plantation Road Bridge over Coldwater Creek in Elbert County, north of Elberton. The Georgia Department of Transportation plans on replacing the current bridge.

Lee 2015
9142 Gresham, Thomas H. Archeological Survey of the Queen Mill Road Improvement Project, Cobb County, Georgia

This project consists of safety and operational improvements to a 1.84 mile length of two-lane Queen Mill Road in southeastern Cobb County. In general the project consists of lessening several curves in the road, adding sidewalks, curbs, gutters and improving several intersections.

Lowndes 2015
9143 Pietak, Lynn Marie Addendum to Ph. I Arch Survey of the Kennesaw Mountain to the Chattahoochee River Trail

The proposed project would construct a 10-foot (desirable) to 8-foot (minimum) multi-use concrete path along the project corridor, as described below.

Mitchell 2015
9144 Reynolds, Michael W. Sandy Springs - SR 9 Sidewalks Improvements Project

The project consists of a 0.7 mile (1.1 km) section of Roswell Road (State Route 9) between Long Island Drive and Meadowbrook Drive NE.

Stewart 2015