Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
9397 Cook, Fred C. A Research Design and Proposal to Conduct Phase II Testing of Archaeological Deposits within the Area of Potential Effects of the Proposed Construction of a Tolomato Island Community Boat Ramp and Dock Facility, McIntosh County, Georgia

The purpose of this research design is to propose a plan to execute a Phase II investigation of archaeological deposits within the Area of Potential Effects (APE) of a planned boat ramp and dock facility construction adjacent to Hudson Creek, Mcintosh County, Georgia by Tolomato Partnership, LLLC

McIntosh County, GA 2006
9398 Braley, Chad O. An Archaeological Survey of the Sweetwater Creek Wastewater Treatment Plant, Douglas County, Georgia

In October of 2006 an archaeological survey was conducted on the existing Sweetwater Creek Wastewater Treatment Plant (WTP), Douglas County, Georgia, and this is a report of the findings.

Douglas County, GA 2006
9399 Perry, Robert E., Oakley, Carey B. Report of Cultural Resouces Assessment of the Proposed West Cobb High School, Cobb County, Georgia

MACTEC Engineering and Consulting (MACTEC), was contracted by Chapman, Griffin, Lanier, Sussenbach Architects, to provide a cultural resources assessment of the proposed West Cobb High School in Cobb County, Georgia.

Cobb County, GA 2004
9400 Ahlberg, James E. Environmetnal Assessment of the Proposed Atlanta Gas Light Company Pipeline Crossing of the Cochran Shoals Unit, Chattahoochee National Recreation Area, Cobb County, Georgia

This report documents the archaeological and environmental surveys completed prior to the Atlanta Gas Light Company pipeline construction. 

Cobb County, GA 1983
9401 Studstill, David E. Lakewood Avenue Bridge Replacement Project Historic Resources Survey

This report has been prepared for Parsons Engineering Science, Inc., in compliance with Section 106 of the National Historic Preservation Act (NHPA) of 1966 and subsequent amendments.

Fulton County, GA 1997
9402 Adams, Scott H., Gibbs, Terrell S. Historical/Archaeological Resources, Wildlife and Endangered Species Assessment for a New Wastewater Treatment Facility Heard County, Georgia

The City of Franklin, Georgia is located in the central western area of the State of Georgia in Heard County at the intersection of State Road 1(US Highway 27) and State Road 34 (Figure 1).

Heard County, GA 2004
9403 Environmental Information Document: North Oconee Water Reclamation Facility Upgrade and Expansion to 14 MGD

In accordance with Georgia Rules and Regulations for Water Quality Control, this Environmental Information Document (EID) examines possible environmental impacts associated with the proposed upgrade of the existing North Oconee Water Reclamation Facility (WRF) for Athens-Clarke County (ACC).

Clarke County, GA 2006
9404 Oakley, Carey B., Perry, Robert E. Report of Phase I Archaeological Resources Survey GDOT Project No. HPP-0000-00(345) GDOT P.I. No. 0000345 Proposed S.R. 307 Overpass Chatham County, Georgia

As part of the site development program at the Georgia Ports Authority (GPA) James D. Mason Intermodal Facility in Savannah, an overpass bridge spanning proposed rail improvements at the facility has been proposed.

Chatham County, GA 2001
9405 Meier, Lawrence W. Archaeological Survey of Cobb-Fulton Counties Monthly Report for June-July, 1974

During the last week of May, 1974, the Survey received authorization from Cobb County (dated April 15, 1974, but delayed in signing) to proceed with Contract 115 A, 115 B, Morgan Falls Interceptor Sewer.

Cobb County, GA 1974
9406 Trinkley, Michael K. Archaeological and Historical Investigation of the Ogeechee Road Bridge Over the Springfield Canals, City of Savannah, Chatham County, Georgia

This study reports on both documentary research and field survey associated with the replacement of the Ogeechee Road bridge over the Springfield Canal on the southwestern edge of the City of Savannah.

Chatham County, GA 2000