4437 Valk, Diana, Joseph, Joseph W. Phase I Archaeological Survey of The Oconee Trail Corridor Clarke County, Georgia

On May 28 and 29 and August 12, 2008, New South Associates conducted a Phase I Archaeological Survey along three proposed trail segments of the North Oconee Greenway.

Clarke 2008
4438 Benson, Robert W., Gresham, Thomas H. Archaeological Survey of the Proposed Alternate B Suttons Corner Bypass, Clay County, Georgia

Southeastern Archeological Services, Inc. (SAS) conducted a Phase I intensive archeological survey of a proposed new alternative bypass of US 27/SR 1 around the crossroads community of Suttons Corner in eastern Clay County for the Georgia Department of Transportation (GDOT).

Clay 2008
4439 Gantt, Mary Elizabeth Phase I Survey of Proposed Spring Road Pedestrian Crossing over CSX Railroad, Cobb County, GA

The proposed project would widen the existing sidewalk on Spring Road over the CSX Railroad to accommodate a multi-use trail (Figures 1 and 2). A pedestrian bridge would be constructed north of, and adjacent to, the existing bridge over the CSX railroad for the trail.

Berrien 2008
4440 Pappas, Andrew A., Butler, C. Scott A Phase I Archaeological Resources Survey of the Windy Hill / Macland Road Connector

In August of 2007, Brockington and Associates, Inc. completed a Phase I archaeological resources survey of the proposed Windy Hill / Macland Road Connector corridor in Cobb County, Georgia. This work was performed under contract with Greenhorne & O'Mara, Inc.

Cobb 2008
4441 Joseph, Joseph W. Phase I Archaeological Survey of the Proposed Newnan Bypass, Coweta County, Georgia

This project investigated the proposed Newnan Bypass between Turkey Creek Road to SR 16, south of Newnan, in Coweta County, Georgia.

Coweta 2008
4442 Lotti, Teresa Ann Archaeological Reassessment of Project NH-006-2(55), Dougherty County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project NH-006-2(55), Dougherty County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NR

Dougherty 2008
4443 Lotti, Teresa Ann Archaeological Assessment of PM#s 2427 & 2430, Douglas County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, PM#s 2427 and 2430, Douglas County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP)"

Douglas 2008
4444 Finney, W. Bozarth Phase I Cultural Resources Survey Proposed Tired Creek Reservoir, Grady County, Georgia

A Phase I cultural resources survey of the proposed Tired Creek Reservoir in Grady County, Georgia was conducted to locate and identify cultural resources within the project area and assess resource significance based on National Register of Historic Places (NRHP) criteria (36 CFR Part 60.4).

Grady 2007
4445 Finney, W. Bozarth Addendum: Phase II Testing of Sites 9GR59, 9GR78, 9GR80, 9GR84, 9GR86, 9GR87, And 9GR89, And Additional Shovel Testing of Sites 9GR59, 9GR60, 9GR76, 9GR77, And 9GR82, Proposed Tired Creek Reservoir, Grady County, Georgia

Phase II archeological testing was conducted on sites 9GR59, 9GR78, 9GR80, 9GR84, 9GR86, 9GR87, and 9GR89 from February 4 through April 4, 2008.

Grady 2008
4446 Loubser, Johannes H. N., Whitley, Thomas G. Archaeological Data Recovery at Site 9GE2178

Site 9GE2178 is a Lamar period Mississippian artifact scatter on a ridge top edge, ranging in height between 462 and 472 feet above mean sea level (141-144 m amsl).

Greene 2008