4807 O'Steen, Lisa Diane CRM: Vogtle-Effingham-Thalmann 500 KV Electric Transmission Line GP-SN-03: Data Recovery

Cultural property GP-SN-03 (designated (T) 9 Sn C.P. * 11 in Garrow 1984) is located in Screven County, Georgia within the Vidalia Uplands of the Coastal Plain Physiographic Province. It lies within the Savannah River drainage system, approximately 105 kilometers (km) from the Atlantic Ocean.

Screven 1986
4808 Larson, Lewis H. Project Summary Notification Review: S-2524(2) EIS, Bulloch County

The impact area for the proposed widening and paving of state road S-2524(2) was surveyed and no cultural debris indicating a site was found. Much of the area under consideration was in low-lying swamp unsuitable for human habitation.

Bulloch 1973
4809 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project BHF-038-2(40), Emanuel/ Burke Counties

The original proposed project would replace the SR 56 bridge over the Ogeechee River, plus the two overflow bridges south of the river. All three will be widened from 25.8 feet to 40 feet.

Burke 2003
4810 Patch, Shawn M. Archaeological Survey of Project STP-0937(8), Burke and Jefferson Counties

The proposed project would construct four passing lanes on SR 24 in Burke and Jefferson Counties.

Burke 2002
4811 Patch, Shawn M. Archaeological Reassessment of Project EDS-565(8)(9), Burke and Richmond Counties

The proposed project would widen and reconstruct US 25 from the Waynesboro Bypass in Burke County, to SR 88 in Richmond County. This project was originally surveyed in 1994.

Burke 2002
4812 Patch, Shawn M. Archaeological Reassessment of Project EDS-565(12), Burke County

The proposed project would widen and reconstruct US 25/SR 121 from just north of the Burke/Jenkins County Line to the Waynesboro Bypass.

Burke 2001
4813 Jeter, Erica Archaeological Reassessment of Project EDS-565(9), Burke-Rickmond Counties

GDOT project EDS-565(9) in Burke and Richmond counties would consist of the widening and reconstruction of US 25 from an existing two lane road into a four lane road between just south of Marchman Road north to Hepzibah. The project was originally surveyed in 1994.

Burke 2001
4814 Avery, George Archaeological Assessment of Project BRF-41-1(16)01, Burke County

Site 9 DOT 13 represents a low density ceramic/lithic scatter dating to the Woodland Period. The site is located on the first terrace of Spring Creek, 160 feet northeast of State Route 78, 1.8 miles southeast of State Route 17, Burke County, Georgia.

Burke 1994
4815 Prosser, Susan S. History Assessment of Project FR-038-2(29), Burke County

The survey boundary and methodology were established using GDOT/FHWA Cultural Resource Survey Guidelines.

Burke 1988
4816 Prosser, Susan S. History Assessment of Project SR-1819(6), Burke County

The survey boundary and methodology were established using GDOT/FHWA Cultural Resource Survey Guidelines.

Burke 1988