Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8685 Murphy, Alicia T., West, Artis, Wege, Laura Archaeological Assessment TCNS ID 15280 Proposed 195-Foot Monopole Telecommuunications Structure (199-Feet overall with Appurtenances) Within A 100-Foot By 100-Foot Compound

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site. The subject site includes a proposed 100-foot by 100-foot compound and an existing 35-foot by 20-footlaccess road.

McDuffie 2013
8686 Bowen, William R. Archaeology Assessment of Project MR-8056(3), Muscogee County

An archaeological survey (Level I) was conducted in accordance with “GDOT Archaeological Survey Guidelines” developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservatio

Warren 2013
8687 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of STP-158-1(16), Harris/Troup Counties

The proposed project consists of the leyeling and resurfacing of SR 103 in Harris County. The proposed project would begin at the intersection of SR 219 (MP 0.00) and extend northwest to end at the intersection of SR 18 (MP 13.92) in Troup County.

Gwinnett 2012
8688 Lotti, Teresa Ann, Duff, Eric Anthony Archaeological Assessment of Project STP-065-3(56), Pickens County

Project STP-065-3(56) would construct two passing lanes on SR 53 between the towns of Tate and Holcomb in Pickens County. In addition, various intersection improvements would be made along the project corridor.

Pickens 2002
8689 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-056- 2 (23) , Pickens County

The proposed project would consist of the reconstruction of the intersection at SR 515 and SR 53 approximately 1.4 km (0. 9 mi) west of the city of Jasper.

Pickens 1997
8690 Fleming, Sherry, Entorf, Robert F. Archaeological Assessment of STP-2312(4), Pickens County

The proposed project consists of 0.460 krn (0.286 mi) of slide repair work on SR 136. The repair work will involve the construction of a tieback wall and paved shoulders. The project would begin at MP 15.67 and end at MP 15.96 north of the city of Jasper.

DeKalb 2013
8691 Shirk, Elizabeth C. P.I. 0005870, PRP-0005-00(870) Bridge Replacement Little Pine Log Creek, Nally Road/CR 204

The proposed project would consist of the proposed replacement of the Little Pine Log Creek Bridge on Nally Road/CR 204. The existing bridge is 180' long and 30' wide. The proposed structure would be 30' wide and 290.4' long.

Dooly 2014
8692 Rotenstein, David S. Archaeological Assessment of Project BRZLB-261(4), Sumter County

An archaeological survey (Level I ) was conducted in accordance with "GDOT Archaeological Survey Guidelines'' developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservat

Berrien 2011
8693 Keller, Susan, West, Artis Archaeological Assessment TCNS ID 15517 Proposed 180-Foot Monopole Telecommunications Structure (185-Feet overall with Appurtenances) Within A 1 00-Foot By 1 00-Foot Compound

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Baker 2015
8694 Alston, Robert L. M-9095(1), Fulton County-Clearinghouse Doc. No. 77-01-20-19

The project area was surveyed by a simple visual inspection. The project area is urban with residential and commercial properties on the west side of Virginia Avenue and predominantly commercial property on the east side.

Cobb 2014