Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8705 Rotenstein, David S. Archaeological Assessment of Project F-065-3(28), Pickens County

This project is the relocation of S.R. 53 from the intersection of S.R. 53 and C.R. 305 in Jasper southeast along C.R. 294 to C.R. 18. From this point to the rejoining of S.R. 53, the project is on new location. The project length is 11 miles, 10 miles along existing route C.R.

Walker 2011
8706 Keller, Susan, West, Artis Section 106 Review TCNS ID 10682 Proposed 175-Foot Monopole Telecommunications Structure ( 180-Feet overall with Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site. The subject site includes a 100-foot by 100-foot compound and a 379-foot by 20-foot proposed access.

Monroe 2014
8707 Alston, Robert L. RF-114-1(19) Fulton; Clearinghouse Doc. No. 77-01-17-02

This project involves the widening of Alpharetta Street in Roswell from Canton Street to Holcomb Bridge Road. The road would be widened from two and three lanes to five lanes. Eighty-six feet of right-of-way would be needed, and existing right-of-way varies between 50 and 80 feet.

Franklin 2011
8708 Blackwelder, Jon R. Phase I Archaeological Survey of Intersection Improvements for SR 8/US 78/Bankhead Highway at Report Title: CR 268/Mann Road/Mason Creek Road and CR 808/Post Road, Douglas County, Georgia

The proposed project would improve the intersections of SR 8/US 78/Bankhead Highway with CR 268/Mann Road and Mason Creek Road, CR 250/Conners Road, and CR 808/Post Road and the intersection of Post Road and Mason Creek Road in the Winston community of Douglas County, Georgia.

Hart 2011
8709 Pietak, Lynn Marie Archaeological Survey of Sandy Springs Circle Streetscapes, Fulton County, Georgia

The proposed project would consist of the construction of nine-foot wide concrete sidewalks with a two-foot brick paver, and 2.5-foot tree/utility strip along both sides of Sandy Springs Circle from Hammond Drive to the project terminus at SR 9/Roswell Road.

Madison 2011
8710 Harvey, Bruce G., Gardner, Jeffrey W. Historic Hydro-Engineering Report: Middle Chattahoochee Project (FERC #2177), Museogee and Harris Counties, Georgia and Lee County, Alabama

This report documents the dams, powerhouses, and related facilities and equipment of the    Middle Chattahoochee Project (FERC #2177) on the Chattahoochee River.

Bryan 2015
8711 Reynolds, Michael W. Archaeological Survey of the Uptown Pine Lake Phase II Improvements Corridor

P.I. 0008121 has been designed to match the typical section of this segment of Rockbridge Road (Allgood Road to Rowland Road) with the typical section of the larger widening project, GDOT P.I. 0008401 (SR 10 / Memorial Drive to Stone-Mountain / Lithonia Road).

Fulton 2015
8712 Williams, Siska Operational Improvement on 5141 SB/ Peachtree Parkway SB at Peachtree Industrial Boulevard SB

The proposed project involves the addition of a second lane from SR141 southbound onto the limited access portion of Peachtree Industrial Boulevard southbound by constructing a new lane on the left shoulder of the existing lane from SR141 SB onto Peachtree Industrial Boulevard; restriping the sou

Walker 2011
8713 Koch, Christopher P. Archaeological Survey for the Georgia Ports Authority (GPA) Rail Tie-in to the Mason Intermodal Container Transfer Facility (ICTF), Garden City Terminal

This project would install connecting tracks from the south end of the GPA's Mason ICTF to the Norfolk Southern Railway.

Pickens 2014
8714 Pietak, Lynn Marie Phase I Archaeological Survey of Newton County Safe Routes to School

The proposed project consists of pedestrian improvements for students, parents and teachers within the vicinity of Fairview Elementary School, Clements Middle School, West Newton Elementary School, Veterans Memorial Middle School, and Live Oak Elementary School in Newton County.

Cobb 2014