Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8655 Patch, Shawn M. Archaeological Survey of Wetland Mitigation Parcels for Project EDS-565(10)(15), Screven County

The proposed project would consist of the preservation of two wetland parcels located in Screven County. No construction-related or other land disturbance activities are planned for these areas. Required right-of-way for the first parcel is approximately 660 meters long by 100 meters wide.

Tift 2010
8656 RS-0696(5), Fulton; Clearinghouse Doc. No. 76-02-09-19.

The Georgia DOT Staff Archaeologist has conducted an archaeological assessment of the above-referenced project. This assessment, including field survey and sub-surface testing, located no archaeological sites.

Henry 2010
8657 Fletcher, Joshua N., Hendrix, Pat, Bailey, Ralph Cultural Resources Survey of the Morgan Tract Chatham County, Georgia

In January 2003, Brockington and Associates, Inc., conducted a cultural resources survey of the Morgan Tract, located in Chatham County, Georgia for Mr. Phillip Morgan, III.

Clarke 2013
8658 Anderson, Nain E. RS-2005, Fulton; Clearinghouse Doc. No. 76-07 -08-11

Location: This project involves the construction of a full diamond interchange at 1-85 and Flat Shoals Road near Union City. Additional right-of-way will be required for the four ramps and realignment of

one dead end frontage road.

Method of Survey:

Oglethorpe 2013
8659 McIntosh, Paul, Duff, Eric Anthony Archaeological Assessment of Project STP-002-4(30), Bibb and Jones Counties

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project STP-002-4(30), Bibb and Jones Counties, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic P

Chatham 2011
8660 Hart, Barry D. Archaeological Assessment of Project EDFR-042-2 (25) Putnam County

This project is the proposed widening and improvement of S.R. 64 from M.P. 9.93 to M.P. 11.57 where C.R. 64 intersects with U.S. 441. A 200 foot wide corridor was surveyed for the length of the project.

Barrow 2010
8661 Pomfret, James Archaeological Reevaluation or Project NH-IM_-475-1 (247), Bibb County

The proposed project would widen Zebulon Road and the Zebulon Road bridge over I-475 in Bibb County. The project would begin 450 feet east of the I-475 northbound exit and entrance ramps and end at Lake Wildwood Drive for a total distance of 0.5 mile. The existing right-of-way is 130 feet.

Lowndes 2011
8662 Koch, Christopher P. Phase I Archaeological Survey of the Proposed Intersection Realignment of Glenridge Drive

The proposed project would consist of the realignment of the existing intersection of Glenridge Drive with SR 9/Roswell Road, which currently consists of a three-legged intersection with a substandard skew (see Figure 1. Project Location Map).

DeKalb 2012
8663 Anderson, Nain E. FF-165-1(1) , Fulton County ; Clearinghouse Doc . No . 76-11-02- 02

Project: FF-165-1(1), Fulton County; Clearinghouse Doc. No. 76-11-02-02.

Gordon 2010
8664 Williams, Siska Safe Routs to Schools Project

Cate Road (Golden Isles Elementary) consists of two 10’ travel lanes. The north side of the roadway has a grasses shoulder and the south side of the roadway has a 4.5’ sidewalk separated from the edge of pavement with a 4.5’ grasses buffer. Existing right of way is approximately 70 feet.

Tift 2011