Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
9578 McQuinn, Corey, Smith, Stefanie M. Third Addendum Phase I Archaeological Survey for the Planned I-985 Interchange of SR 13 Crossover Near Martin Road, Hall County, Georgia GDOT Project No. NHS00-0000-00(425) GDOT PI No. 0000425 HP # 060811-004

The Georgia Department of Transportation (GDOT) plans to build a new interchange on Interstate 985 (I-985) and an associated connector road between Thurmon Tanner Parkway (formerly Thurmon Tanner Road) and Falcon Parkway (SR 13) (Figure 1), to be known as Martin Road Extension.

Hall County, GA 2017
9579 Blackwelder, Jon R. Addendum to Phase I Arch. Survey of Proposed Revive I-285 Top End, Cobb, DeKalb and Fulton Counties: Phase I Archaeological Survey of the GM Plant Advanced Acquisition Parcels, DeKalb Co.

The proposed project would consist of the advanced acquisition of ROW and/or easement from three parcels (Parcels 1, 2 and 3) within the proposed Revive I-285 managed lanes corridor.

DeKalb County, GA 2017
9580 Avery, Paul G., Ross, Jason Phase I Archaeological Survey for the Proposed Epic RV Resort, Camden County, Georgia

Cultural Resource Analysts, Inc., was contracted by EPIC RV Resort, LLC, to conduct a phase I archaeological survey for the proposed EPIC RV Resort in Camden County, Georgia.

Camden County, GA 2017
9581 Pappas, Andrew A. Phase I Archaeological Resources Survey of the SR 19/US 23 Overpass at the Norfolk Southern Railroad Crossing, Jeff Davis County, Georgia.

The Georgia Department of Transportation (GDOT) proposes to construct an overpass/grade separation near the Norfolk-Southern Railroad crossing along State Route 19 (SR 19)/US 23 in Hazlehurst, Georgia (Figures 1 and 2).

Jeff Davis County, GA 2017
9582 Trudeau, Mary F., Balinger, Duncan Addendum Phase I Archaeological Survey for the I-85 General Purpose Widening from North of CR 134/Hamilton Mill Road to North of SR 211, Gwinnett, Barrow, and Jackson Counties, Georgia.

This addendum survey is to address portions of the project area that lie outside of previous archaeological survey coverage. The two GDOT P.I. Nos.

Barrow County, GA 2017
9583 Moss, Richard A., Trudeau, Mary F. Phase I Archaeological Survey of Proposed Traffic Signal Upgrades at Nine Intersections in Chatham County, Georgia

Edwards-Pitman Environmental, Inc. (EPEI), under a contract with Wolverton & Associates, Inc., conducted Phase I archaeological survey for the Georgia Department of Transportation (GDOT) project to upgrade traffic signals at nine intersections in Chatham County, Georgia (PI No.

Chatham County, GA 2017
9584 Gale, Sara H. Field notes for GDOT Project STP-0186-01(025), PI# 621720, Paulding County, Georgia

Site consists of a medium density unknown prehistoric quartz lithic scatter. No diagnostic artifacts were recovered from the site and the remains indicate that this was an expedient tool manufacturing site using very poor raw materials.

Paulding County, GA 2010
9585 Lowrey, Jonathan D. A Phase 1 Archaeological Survey for the Proposed SR 141 (Peachetree Road) Pedestrian Streetscape Improvements Project, PI 0010326, Dekalb County, Georgia.

The proposed project consists of approximately 2.2 km (1.4 mi) of concrete sidewalk installation including curb cut

ramps, ADA compliant driveways, and crosswalks along the Peachtree Road corridor from North Druid Hills Road to

DeKalb County, GA 2017
9586 Moss, Richard A. Phase I Archaeological Survey of a Proposed Turn Lane at the Intersection of State Route (SR) 138 and Amherst Lane, Rockdale County, Georgia

State Route (SR) 138 is a two-lane road that is classified as an Urban Principal Arterial. SR 138 currently has an eastbound right turn lane for Amherst Lane.

Rockdale County, GA 2017
9587 Baughman, Pamela J. Addendum to State Route (SR) 92 at County Road (CR) 149/Antioch Road (Rd.) and CR 308/Lockwood Rd. and SR 92 at Harp Rd. and Seay Rd.

The proposed project would improve SR 92 between and at the intersection of CR 149/Antioch Rd. and CR 138/Seay Rd in Fayette County, Georgia. The proposed improvements on SR 92 would begin approximately 1000 feet (ft.) south of the existing intersection with Lockwood Rd.

Fayette County, GA 2017