Report Number Author(s) Title Abstract Summary County Year
4687 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project STP-052-2-(18), Barrow County

The proposed project would consist of the construction of an eastern bypass for the city of Winder in Barrow County.

Barrow 2001
4688 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Projects NH-IM-85-2 (166-174), Barrow, Jackson, Banks, and Franklin Counties

The proposed projects would widen and reconstruct 1-85 from SR 211 in Barrow County northward to SR 17 in Franklin County, for a total length of 46.9 miles. A new lane will be added within the existing median. All proposed work would be done within existing right-of-way.

Barrow 2002
4689 Erickson, Luke W. Archaeological Survey of Project STP-0005-00(526)

The overall proposed project would consist of relocating a portion of CR 169/Midland Avenue.

Barrow 2003
4690 Richardson, Rick R. Archaeological Assessment of Project STP-0911(6), Barrow County

The proposed project consists of the improvement of horizontal and vertical alignment, at three locations along SR 211 between winder and 1-85 in Barrow County.

Barrow 1996
4691 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-00MS(295), Barrow County

The proposed project would consist of the leveling and resurfacing of SR 211 in Barrow County. Also included in the proposed project would be the paving of 0.6 m (2 ft) of the existing shoulders of SR 211.

Barrow 1998
4692 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-1308 (9), Barrow/Walton County

The proposed project would consist of the paving of approximately 0.6 m (2 ft left and right) of the existing shoulders on SR 81 in Bulloch County. The project would begin at the intersection of SR 20 in Walton County and end at Stafford Street in the city of Winder in Barrow County.

Barrow 1996
4693 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-0910 (15), Barrow County

The proposed project would consist of the paving of 0.6 m (2 ft) of the existing shoulders of SR 124. The proposed project would begin at the Gwinnett/Barrow County line and would end at the SR 53 intersection in Jackson County.

Barrow 1998
4694 Duff, Eric Anthony Archaeological Assessment of Project STP-00MS(289), Crisp, Ben Hill, Mitchell, Tift, and Worth Counties

Project STP-OOMS(289) would replace the existing traffic signal systems at intersections in the cities of Cordele, Fitzgerald, Camilla,' Tifton, and Sylvester.

Crisp 1998
4695 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of STP-065_3(52), Barrow County

The proposed project consists of improvements to the intersection of SR 53 and Rockwell Church Road/CR 4 just north of the city of Winder.

Barrow 1998
4696 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of BRZLB-13(13), Barrow County

The proposed project consists of the replacement of the bridge on CR 125/McElhannon Road over the Apalachee River just south of the city of Bethlehem.

Barrow 1998