Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
4677 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-0781(11), Wilkinson/ Baldwin Counties

The proposed project would consist of the paving of approximately 0.6 m (2 ft left and right) of the existing shoulders on SR 243.

Baldwin 1996
4678 Joseph, Joseph W. Section 106 Review / Archaological Investigation: Phase I Intesive Archaeological Survey of Approximately 30 Acres of Additional Area of the Proposed West Campus Housing Project at Georgia College & State Univesity, Baldwin, County, Georgia

A 30 acre area is proposed for the expansion of housing facilities at Georgia College & State University. This acreage is one of two locations targeted for the expansion of the West Campus. This report focuses on the intensive archaeological survey of the western portion.

Baldwin 2002
4679 Berkin, Jon, Goodwin, R. Christopher Phase I Cultural Resources Survey of the Georgia Portion of the Proposed Southern Natural Gas Company Georgia-Alabama Settlement Facilities Project

Phase I cultural resources survey of the 36.86 km (22.9 mi) Georgia portion of the proposed Southern Natural Gas Company Georgia-Alabama Settlement Facilities Project was conducted by R. Christopher Goodwin & Associates, Inc., during May 1995.

Henry 1995
4680 Larson, Lewis H. Phase I Archaeological Assessment of the Birdberry Nature Trail located within Fort Yargo State Park, Barrow County, Georgia.

On July 31, 1990 an archaeological foot survey was conducted by David J. Davis of the Office of the State Archaeologist of the Birdberry Nature Trail in Fort Yargo State Park, Barrow County, Georgia.

Barrow 1990
4681 O'Grady, Patricia D. Parks and Historic Sites Capital Outlay Projects SFY 83, project #8-752

In accordance with the Parks and Historic Sites Capital Outlay Projects SFY 83 planned development, an archaeological survey was carried out at Fort Yargo State Park on August 18, 1982. Proposed development consists of a camping area.

Barrow 1982
4682 Webb, Robert S. Cultural Resources Survey Proposed Hudson River Reservoir and Dam Site Banks County, Georgia

During March and April, 1989, Robert S. Webb, Beth Gantt, Sterling Howard and Thomas Pickett conducted an intensive coverage cultural resources survey of approximately 230 hectares (570 acres) in Banks County, Georgia for G. Ben Turnipseed Engineers.

Banks 1989
4683 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-00MS(142), Multiple Counties

The proposed project would involve the encasing of the existing steel H-beams in concrete to strengthen the bridge supports at locations throughout the state. Existing right-of-way is approximately 30.5 m (100 ft). All construction will be limited to the existing right-of-way.

Bartow 1997
4684 Stanfield, Tal Project STP-0911(7), Barrow County: Proposed Intersection Improvements on SR 211 at Rockwell Church Road/CR 327

The proposed project would widen and reconstruct the intersection of SR 211, CR 4, and SR 327 in Barrow County.

Barrow 2000
4685 Fernandez-Sardina, Ricardo Archaeological Evaluation of Project STP-2953(4) Barrow County

The proposed project would consist of the widening of SR 8 at CR 97/Ed logan Road. The project would provide a left turn lane for both east and eastbound traffic on SR 8.

Barrow 1994
4686 Southerlin, Bobby G., Sanders, Joseph Archaeological Survey of the Miliam Farm Tract, Bartow County, Georgia

Eight archaeological sites were recorded within the Milam Farm tract.

Bartow 1999