4657 Higginbotham, Brandon, Entorf, Robert F. Archaeological Assessment of Project PR-39 (007), Baker County

Project PR-39 (007) allows for grading, drainage, base and surfacing on approximately 2.3 km (1.4 mi) of roadway on CR 39 and CR. 43 in Baker County. The proposed project on CR 39 would begin at CD 30 and would continue northerly for 1.4 km (.9 mi) to CR 43.

Baker 1995
4658 Entorf, Robert F. Archaeological Assessment of Project PR-122(007), Baker County

Project PR-122(007) allows for grading, drainage, base and surfacing on approximately 3.41 km (2.12 mi.) of roadway on CR 122/Pot Plane Road. The proposed project on CR 122 would begin at CR 1 and end at the Dougherty County line.

Baker 1995
4659 Patch, Shawn M. Archaeological Survey of Project STP-M000-00(214), Appling, Brantley, Charlton, Effingham, and Long Counties

The proposed project would consist of pile rehabilitation on 19 bridges.

Appling 2000
4660 Rotenstein, David S. Archaeological Assessment of Project BRF-032-1(13), Baker County

This project is the replacement of the bridge on Ga. 37 over Checkasawhatchee Creek. The project occurs within existing right-of-way for a length of 3,400 feet and a width of 100 feet and 200 feet.

Baker 1985
4661 Gardner, Jeffrey W. Archaeological Survey of Two Proposed Borrow Areas, Bartow County, Georgia

In July 1994, Brockington and Associates, Inc., conducted an archaeological survey of two proposed borrow pits for the Public Works Department of the City of Cartersville, Georgia.

Bartow 1994
4662 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project NH-089-1(26), Baldwin County

The original proposed project would widen SR 49 from west of Allen Memorial Drive to east of the bridge over Fishing Creek, for a distance of 2.4 miles. Right-of-way along SR 49 is approximately 100 feet; additional required right-of-way varies from 20 to 50 feet.

Baldwin 2001
4663 Pomfret, James Archaological Survey of Project STP-004-2(38), Baldwin County

The proposed project proposes to reconstruct and improve the intersection of SR 22/24 and CR 472 approximately 1.2 miles east of the city limits of Milledgeville.

Baldwin 1999
4664 Southerlin, Bobby G., Reid, Dawn Marie Management Summary Cultural Resources Reconnaissance of a Proposed Water Treatment Plant in Bartow County, Georgia

On December 4, 1995, Brockington and Associates, Inc. conducted archaeological reconnaissance within a proposed Bartow County water treatment plant tract.

Bartow 1995
4665 Patch, Shawn M. Archaeological Survey of Project NH-004-2(29), Baldwin County

The proposed project would relocate and improve SR 22/SR 24 east of Milledgeville in Baldwin County. The proposed project would begin at CR 171 and extend eastward, primarily on new location, to end at the SR 22/SR 24 split, for a total distance of approximately 3.5 miles.

Baldwin 2001
4666 Schoeneberg, Erica Archaeological Assessment of Project BRZLB-009(5), Baldwin County

Proposed project BRZLB-009(5) in Baldwin County replace the narrow and structurally deficient bridge on CR 72/Pettigrew Road over Fishing Creek, approximately 6.0 miles west of Milledgeville.

Baldwin 1999