4697 Kelly, Arthur Randolph Review Supplement on Final Archaeological Test Operations and Laboratory Analysis of Materials from the Grove River Watershed Structures 33 and 51 and Sand Pumping Site, Structure 2, Jackson and Banks Counties, Georgia

Following upon initial study and review of the University of Georgia survey report on the Grove River Watershed, A. R. Kelly visited sites in company with Charles Till, SCS geologist, and Richard Jefferies, Field. Director of the UGA survey.

Jackson 1976
4698 Fish, Paul R. An Archaeological Survey for a 201 Wastewater Facility at the Georgia Industrial Institute Near Alto, Banks County, Georgia

This report represents the results of an archaeological field survey of a proposed 201 Wastewater Facility at the Georgia Industrial Institute near Alto, Banks County, Georgia. The proposed construction area consists of expansion of an existing sewage treatment plant by several acres.

Banks 1977
4699 Entorf, Robert F. Archaeological Assessment of Project F-055-1(37) & (38), Banks County

The proposed project is the reconstruction and partial relocation of U.S. 441/S.R. 15 and S.R. 198 and would include upgrading of existing road sections as well as extensive new location. The proposed project would begin at the intersection of U.S. 441/S.R. 15 and C.R.

Banks 1987
4700 Richardson, Rick R. Archaeological Assessment of Project MLP-938(1), Jackson/Banks Co.s

The proposed project would widen an existing privately owned road parallel to Interstate 85 from approximately 487.7 m (1600 ft) southeast of the Banks' county line in Jackson County until reaching a point approximately 289.6 m (950 ft) south of Ridgeway Road in Banks County.

Jackson 1995
4701 Duff, Eric Anthony Archaeological Assessment of Project EDS-441(30), Banks County

Project EDS-441(30) consists of the widening and reconstruction of US 441/SR 15 from CR 230 to CR 150 in Banks County. Archaeological clearance for the proposed project was completed by GDOT staff archaeologist Bob Entorf in 1987.

Banks 2000
4702 Pomfret, James Archaeological Survey of Project IM-OOMS(331), Bartow County

The proposed project would reconstruct five existing asphalt exit ramps on 1-75 in Bartow County. The exit ramps are located at CR 397, Red Top Mountain Road, SR 113, SR 20, and Glade Road. On 1-75 the southbound exit ramp at SR 20 will be extended to the SR 113 interchange.

Bartow 2000
4703 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project STP-0001-00(574), Bartow County

The proposed project would consist of reconstruction of median crossovers along SR 3/US 41 at various locations in Bartow County. The project begins at the Cobb County/Bartow County Line and proceeds northward to the SR 293 Connector. The total length of the project is 15.15 miles.

Bartow 2000
4704 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-015(5), Bartow County

Project BRZLB-015(5) consists of the replacement of a 21'x40' concrete bridge on CR 114 over the Oothkalooga Creek tributary south of Adairsville. The project begins approximately 500 feet north of the bridge and ends 500 feet south of the bridge.

Bartow 1993
4705 Rotenstein, David S. Archaeological Assessment of Project TSAP-777(1), Bartow County

The project proposes the relocation of U.S. 411 from the U.S. 441/S.R. 20 interchange with U.S. 41 to 1-75. The project will occur on new location, in a corridor 4.3 miles long and 400 feet wide.

Bartow 1986
4706 Paglione, Teresa L. Assessment of Project TSAP-140(58), Bartow County

The proposed project would construct an access driveway to property in the northeast quadrant of the SR 140 and 1-75 intersection. Approximately 60 feet of right-of-way would be required.