4707 Duff, Eric Anthony, Fleming, Sherry Archaeological Assessment of Project BLDG-DIST-6-95(040), Bartow County

The proposed project would consist of the construction of a traffic Signal Headquarters for GDOT District 6 in Bartow County. The project also includes the construction of a driveway for the facility and a chain link fence around the facility.

Bartow 1995
4708 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project NHS-0000-00-(932), Bartow County

Project NHS-0000-00(932) would replace the existing asphalt ramps with concrete ramps at the 1-75 intersection with US 411/SR 61 in Bartow County. The proposed project would also upgrade the guardrails, turning radii, and acceleration and deceleration lengths.

Bartow 2002
4709 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project STP-179-1(8), Bartow and Polk Counties

Project STP-179-1(8) would reconstruct a portion of SR 113 onto new location beginning at CR 36 in Bartow County and terminating at the existing SR 113 in Polk County. This proposed project has been subjected to a previous survey by Teresa Paglione in 1991.

Bartow 2001
4710 Pomfret, James Archaeological Assessment of Project STPN-208-1(16), Bartow County

The proposed project would reconstruct the intersection of State Route 61 with Old Alabama Road and Carnes Road in Bartow County.

Bartow 2000
4711 Pomfret, James Archaeological Survey of Project STP-828(23), Bartow County

The proposed project would construct three passing lanes on SR 140 between the Cherokee County line and US 411. Construction for the passing lanes would begin at Mile Post 19.05 and end at Mile Post 21.90.

Bartow 2000
4712 Bowen, William R. Archaeological Assessment of Project F-003-2(45-49), Gwinnett-Barrow-Oconee Counties

This project would construct a 4-lane divided roadway on a minimum of 300 feet right-of-way from the present S.R. 316 terminus northeast of Lawrenceville to U.S. 78/S.R. 10 south of Bogart, a length of approximately 25 miles. A survey consistent with the project corridor was conducted.

Gwinnett 1986
4713 Bowen, William R. Archaeological Assessment of Project-RS-0828(6), Bartow County-Reevaluation

This reevaluation is the relocation of U.S. 411/S.R. 61 at S.R. 140 at Rydal. The project is approximately 0.7 mile long and a corridor 50 feet either side of the proposed centerline was surveyed.

Bartow 1985
4714 Bowen, William R. Archaeological Assessment of Project BRZLB-15(6), Bartow County

This is a bridge replacement on new location on C.R. 316 over Oothcalooga Creek. The project is approximately 1,200 feet long with a required right-of-way of 100 feet. An archaeological survey consistent with the project limits was performed.

Bartow 1986
4715 Bowen, William R. Archaeological Assessment of Project IR-75-3(156-161), Bartow, Gordon, Whitfield, and Catoosa Counties.

This is the within-median addition of a northbound and southbound travel lane on 1-75 from U.S. 411 to the Tennessee State line. A corridor from U.S. 411 to the Tennessee State line and within the existing right-of-way was surveyed.

Bartow 1985
4716 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of BLDG-DST6-95(41), Bartow County

The proposed project consists of the construction of a new metal District Six Sign Shoo building. The building would be located adjacent to Old Martin Road/CR 130 across the street from an existing maintenance compound northwest of the city of Cartersville.

Bartow 1997