Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
4717 Entorf, Robert F. Archaeological Assessment of Project EDS-460(1), Bartow, Cherokee, and Forsyth Counties

The proposed project would construct on new location a connector between 1-75 in Bartow County and S.R.371 in Forsyth County. The proposed project consists of two alternate routes.

Bartow 1989
4718 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of BHF-012-1(95), Bartow County

The proposed project consists of the replacement of the existing structurally deficient east and_ westbound bridges on SR 20/US 411 over the W & A Railroad and SR 293. Additionally, the project will include the widening of the bridges by 4.66 m (15.3 ft).

Bartow 1996
4719 Entorf, Robert F. Archaeological Assessment of STP-001-5(50), Bartow County

The proposed project consists of the improvement of the intersection of SR 3/US 41 and Mockingbird Drive/Center Road. The project begins approximately .48 km (.3 mi) south of the intersection and ends approximately 1.61 km (1 mi) north of the intersection.

Bartow 1995
4720 Higginbotham, Brandon, Entorf, Robert F. Archaeological Assessment of Project NH-12-1(94), Floyd/Bartow

The proposed project consists of resurfacing on SR 20.in Floyd and Bartow Counties. The project begins at mile post 20.79 in Floyd County and continues easterly to an end point at mile post 12.12 in Bartow County for a total of 29.58 kilometers (18.39 miles).

Floyd 1995
4721 Entorf, Robert F. Archaeology Assessment of Project FR-019-1(12), IR-75-3(171), Bartow County

The proposed projects would widen and reconstruct S.R. 140 between U.S. 41 and 1-75 in north Adairsville. The combined projects would begin at the intersection of U.S. 41 and would proceed easterly to a point approximately 1800 feet east of 1-75.

Bartow 1987
4722 Entorf, Robert F. Archaeology Assessment of Project PR-264-1(015) Section 1 & 3 and RRS-000S(591), Bartow County

The proposed projects would construct on new location a connector which would parallel the northeast side of 1-75 between Grassdale Road and U.S. 411 north of Cartersville.

Bartow 1988
4723 Studstill, David E. Request for Permit to Change Land Use, OCGA 36-72, "Abandoned Cemeteries and Burial Grounds", 1991, as Amended, for GDOT projects NH-018-1(56) and BRF-018-1(44), Bartow County, GA

Enclosed please find information provided for your use in applying for and obtaining a permit for land use change involving a cemetery/Indian mound. The information provided should be sufficient to prepare an application and obtain a permit for this project.

Bartow 1995
4724 Regnier, Amanda Leigh, Silliman, Garrett W. The Phase I Archaeological Survey of the Proposed Leake Mounds Trail, Bartow County, Georgia

On March 3, 2008, Edwards-Pitman Environmental, Inc. (EPEI) conducted an archaeological survey of the proposed Leake Mounds Trail in Bartow County.

Bartow 2008
4725 Larson, Lewis H., Anderson, Nain E. RS-0828(6), Bartow County Clearinghouse Document number 74-06-06-13

The project involves widening of S.R. 140. In three sections, one around Pine Log, one around Gum Springs, and one around Folsom, the project will be on new alignment with 80' to 100' of new right-of-way.

Bartow 1977
4726 Larson, Lewis H., Anderson, Nain E. BRS-1021(2), Bartow; Clearinghouse doc. No. 75-01-22-01

Enclosed is a copy of the survey report for a bridge replacement over Pettit Creek. The survey was conducted as a part of the 404 Permit procedures. A single site was located.

Bartow 1977