4647 Richardson, Rick R. Archaeological Assessment of Project FR-036-2(11), Bacon County

The proposed project would construct an eastbound passing lane on S.R. 32 from m.p. 13.4 to m.p. 14.6 and consists of S.R. 203 improvements. Improvements to the S.R. 32/S.R. 203 intersection would include a new location realignment of S.R. 203 along an existing dirt road.

Bacon 1992
4648 Erickson, Luke W. Archaeological Survey of Project STP-M001-00(854), Various Counties

The proposed project consists of the addition or extension of pile encasements on bridges at seventeen different locations. All of the proposed bridges have steel H-piles located in the water that will either need concrete encasements added or extended.

Bartow 2002
4649 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project BRSLB-1586(4), Baker County

The proposed project would replace the CR 67 bridge spanning Mill Creek in Baker County. The existing bridge is a 120 foot X 22 foot timber and concrete structure, and would be replaced with a 120 foot X 28 foot concrete structure on existing alignment.

Baker 2001
4650 Fleming, Sherry Archaeological Assessment of STP-00MS(357), Berrien, Lanier, Atkinson Counties

The proposed project consists of the paving of 0.6 m (2 ft) of the existing shoulders along SR 64. The project would begin approximately 0.3 km (0.2 mi) east of the intersection of SR 11 in Berrien County and would end at the intersection of SR 31 in Atkinson County.

Berrien 1998
4651 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project BRZLB-007(2), Baker County

The proposed project would consist of replacing the bridge spanning Chickasawhatchee Creek along CR 121 in Baker County. The existing bridge is a 240' X 22' concrete structure, and will be replaced with a 240' X 28' concrete structure on new alignment just north of the existing bridge.

Baker 2001
4652 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project BRSLB-1630(4), Baker County

The original proposed project would consist of replacing the bridge spanning Big Cypress Creek along CR 124 in Baker County. The existing bridge is a 120' X 24' concrete structure, and would be replaced with a 120' X 28' concrete structure.

Baker 2001
4653 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project NH-IM-75-3(227), Bartow/Gordon Counties

The proposed project would consist of milling, leveling, and resurfacing of the roadway "and shoulders of SR 401/I-75. The project would begin at the northern end of the CSX railroad bridge north of Cartersville and end at the southern end of the bridge over SR 156 in Gordon County.

Bartow 1996
4654 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-00MS(186), Bartow, Chattooga, Floyd, Gilmer, Gordon, Murray, Pickens, Walker, and Whitfield Counties

The proposed project would involve the encasing of the existing steel H-beams in concrete to strengthen the bridge supports at locations throughout the northwestern portion of the state. Existing right-of-way varies from bridge to bridge.

Bartow 1996
4655 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project BRSLB-1630(4), Baker County

The proposed project would consist of replacing the bridge spanning Big Cypress Creek along CR 124 in Baker County. The existing bridge is a 120' X 24' concrete structure, and will be replaced with a 120' X 28' concrete structure.

Baker 2000
4656 Pomfret, James Archaeological Survey of Project BHF-131-1(11), Baker County

The proposed project would replace the existing bridge over Ichawaynochoway Creek on SR 91 in Baker County. The proposed bridge would be constructed on a new alignment south of the existing bridge. The existing right-of-way is 100 feet.

Baker 1996