Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
7054 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project PRLOP-16 (185), Lowndes County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, and the Georgia Environmental Policy Act of 1991, project PRLOP-16(185), Lowndes County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusi

White 2010
7055 Sipes, Eric D., Wood, W. Dean Cultural Resources Survey and Testing of the Proposed Southern Rivers Energy District Office and Operations Center, Macon, Bibb County , Georgia

Southern Research, Historic Preservation Consultants, Inc., has completed cultural resources survey and testing for the proposed 67-acre Southern Rivers Energy District Office and Operation Center located at the intersection ofUS8o/Eisenhower Parkway and Fulton Mill Road, Macon, Bibb County, Geo

Gordon 1995
7056 Espenshade, Christopher T., Stanyard, William F. Cultural Resource Assessment and Mitigation of 22 Acres Proposed For Expansion of the R.L. Sutton Water Treatment Plant, Cobb County, Georgia

TRC Garrow Associates, Inc. (TRC), conducted a series of cultural resource studies of a 22-acre tract slated for impact by the expansion of the R. L. Sutton Water Treatment Plant, located in Cobb County, Georgia.

Whitfield 1995
7057 Jones, Joel, Gresham, Thomas H. An Archaeological Survey of the Proposed Widening of Barrett Parkway, Cobb County, Georgia

In December 2008, Southeastern Archeological Services, Inc. conducted an archeological survey ofproposed widening along a 5.63 km (3.5 mi) section of Barrett Parkway.

Glynn 1978
7058 Pietak, Lynn Marie, Quirk, Phillip W. Phase I Archaeological Survey of the Proposed Walkers Church Substation, Greene County, Georgia

During May 2007, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the Walkers Church Substation.

Gordon 2001
7059 Keith, Scot J., Davis, Valerie Phase I Archaeological Survey for the Bridge Replacement on SR 64 over 17-Mile River

New South Associates completed the archaeological survey portion of the Cultural Resource Survey for the bridge replacement on SR 64 over 17-Mile River in response to request by CDM Smith.

Glynn 1975
7060 Banguilan, Alvin J., Joseph, Joseph W. Phase 1 Archaeological Survey of the Proposed Intersection Improvement Area At State Route 16 at Poplar Road and Orr Road Coweta County, Georgia

New South Associates conducted a Phase I archaeological survey of the proposed intersection improvements at State Route 16 at Poplar Road and Orr Road in Coweta County, Georgia. Archaeological field investigations took place on March 28, 2002.

Glynn 1973
7061 Keith, Scot J., Davis, Valerie Phase I Archaeological Survey for the Bridge Replacement on SR 158 over Satilla River

New South Associates completed the archaeological survey portion of the Cultural Resource Survey for the bridge replacement on SR 158 over the Satilla River in response to a request by CDM Smith.

Glynn 1967
7062 Sheldon, Elisabeth Shepard, Weiss, Paula L. Archaeological Resurvey of the Proposed North Terminal Development Fulton County Airport - Brown Field, Fulton County, Georgia

Several pieces of legislation including the Historic Preservation Act of 1966, the National Environmental Policy Act (NEPA), Executive Order 11593, 1974 Amendments to the Reservoir Salvage Act and 1980 Amendments to the NEPA protect historic, architectural, archaeological and cultural resources.

Randolph 1985
7063 Patton, Robert B. Archaeological Survey for the Proposed Blakely-Early Industrial Park, Early County, Georgia

The Early County Development Authority proposes improvements to a 7. 7 -hectare (19-acre) lot, as part of a Blakely-Early County Industrial Park planned for the area immediately northeast of Blakely, Georgia.

Stewart 1985