Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
7394 Joseph, Joseph W. Reevaluation of the Phase I Archaeological Survey of the SR 211/SR 124 Intersection, Barrow County, Georgia

Project STP00-0001-00(038) consists of intersection improvement at the State Route (SR) 211 and SR 124 intersection located south of the City of Braselton in Barrow County Georgia.

Coffee 2003
7395 Williams, Siska Archaeological Reevaluation of GDOT Project BR000-0003-00(081), Bridge Replacement on CR 321 Taliaferro Springs RD 1 Mile South of Lyerly in Chattooga County; PI 0003081; HP-020114-003

In compliance with Section 106 of the National Historic reservation Act of 1966 and amendments thereto, GDOT Project BR000-0003-00(081), Chattooga County, has been surveyed with respect to archeological resources, especially those on or eligible for inclusion in the National Register of Historic

Putnam 1994
7396 Mustonen, Heather Archaeological Assessment of GDOT Maintenace Project, PI M004250, Fulton County; HP-100927-001

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, GDOT Maintenance Project MOO 250, Fulton County, bas been surveyed with respect to archeological resources, especially th se on or eligible for inclusion in the

Richmond 1995
7397 Pietak, Lynn Marie Second Addendum to: Phase I Archaeological Survey of the State Route 191 Over Scull Shoal Creek Bridge Replacement, Madison County, Georgia

The proposed project would begin approximately 920 feet south of the bridge and end approximately 1,395 feet _north of the bridge. The total project length would be approximately 2,315 feet (0.44 mile).

Putnam 1978
7398 Blackwelder, Jon R. Second Addendum to the Phase I Archaeological Survey fo SR 136 over West Chickamauga Creek, Walker County, Georgia

The proposed project would begin approximately 477 feet west of the bridge and end approximately 873 feet east of the bridge. The total project length would be approximately 1,350 feet (0.26 mile). The existing SR 136 typical section contains two 12-foot travel lanes

Bryan 2007
7399 Koch, Christopher P. Addendum: Intersection improvements at La Vista and Oak Grove Roads

This addendum addresses omission of a 700-foot storm sewer pipe from the original intersection improvement at La Vista and Oak Grove Roads between Oak Grove Heights and Elon Way.

Lowndes 2001
7400 Lotti, Teresa Ann Archaeological Assessment of Proposed Median and Streetscape Improvements along State University Drive in Fort Valley, Peach County

The proposed project consists of the proposed median and streetscape improvements along State University Drive in Fort Valley.

Lowndes 2002
7401 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of the Proposed Davidson-Roberts Road Improvements

Per our conversation, the 0.067 acres of property within the boundary of Moody AFB proposed to be obtained as a temporary easement during construction of Davidson Road was surveyed in 1996 by Panamerican Consultants, Inc.

Lowndes 2002
7402 Gale, Sara H. Cedarwood Cemetery Improvements in the City of Richland Stewart County, Georgia

The proposed project would consist of replacing the existing iron fence around Cedarwood Cemetery in Richland Georgia (Figure 1) with a new iron fence or powder-coated aluminum fence; installing a modular retaining wall around the cemetery perimeter to correct areas of severe erosion; installing

Houston 2009
7403 Botwick, Brad, Davis, Valerie Addendum to the Phase I Archaeological Surveys, Jeffersonville and Millerfield Road Widening

The Georgia Department of Transportation (GDOT) intends to widen Jeffersonville and Millerfield roads near the crossroads community of Cross Keys in Bibb County (Project Nos. STP00-3223-00(004 )/BRMLB-3223-00(006), STP00-3223-00(002), STP00-3223-00(005), and STP00-0000-00(835), PI Nos.

Lowndes 2002