7384 Silliman, Garrett W., Pietak, Lynn Marie Phase I Archaeological Surveye of the Broad Avenue Bridge over the Flint River and Phase II Archaeological Testing of Site 9DU193, Dougherty County, Georgia

In March, June, July, September and October 2010, Edwards-Pitman Environmental, Inc.

Putnam 1987
7385 Botwick, Brad, Keith, Scot J. Phase I Archaeological Survey of an Additional Parcel of the Gateway Tract

In January of 2011, New South Associates, Inc. conducted a Phase I Archaeological Survey of a parcel of land appended to the eastern portion of the existing Gateway Tract, a 125-acre parcel that was surveyed by New South in 2009.

Fulton 2001
7386 Baughman, Pamela J. Addendum to the Phase I Archaeological Survey of the SR 96 Corridor, Houston and Twiggs Counties, Georgia

This addendum report discusses the findings of a reevaluation survey undertaken to address project changes for GDOT Projects STP00-0155-01 (023), CSNHS-0007-00(251), and STP00- 0155-01(022), P.l. No. 322470, 0007251, and 322460, Houston and Twiggs Counties, Georgia.

Twiggs 2012
7387 Mustonen, Heather Addendum Report Archaeological Survey of the West Rome Bypass Floyd County, Georgia

In compliance with the National Historic Preservation Act (NHPA) of 1966, as amended, archaeologists with the Georgia Department of Transportation (GDOT) conducted a Phase I intensive survey of the proposed West Rome Bypass [GDOT Project HPPNH-0012-01(085), PI 621660] in Floyd County, Georgia.

Hall 2012
7388 Valk, Diana, Joseph, Joseph W. Addendum to the Phase I Archaeological Survey of The Oconee Trail Corrido Clarke County, Georgia

The current project is an addendum to the Phase I Archaeological Survey of the Oconee Trail Corridor carried out in 2008 (Valk 2008). This project as conducted for Kimley-Horn and Associates, Inc.

Oconee 1978
7389 Joseph, Joseph W. Phase I Archaeological Survey for Intersection Improvements at Bell Road and Boles Road, Fulton County, Georgia

The Phase I Archaeological Survey was carried out for the propose improvements to the intersection of Boles Road and Bell Road. The project would replace the current tee intersection between Boles Road and Bell Road with a three-leg single lane roundabout.

Fulton 2012
7390 Gale, Sara H. Archaeological Phase I Survey for the Early Acquisition of the Rook Gwinnett Property at SR 316 and Cedars Road Gwinnett County

In compliance with the National Historic Preservation Act (NHPA) of 1966, as amended, archaeologists with the Georgia Department of Transportation (GDOT) conducted a Phase I intensive survey of the Rook Gwinnett parcel as a potential early acquisition property [CSNHS-0006-00(306), PI# 0006306] fo

Floyd 2001
7391 Koch, Christopher P. Atlanta Highway and Ed Hogan Road Intersection Improvement

The proposed project would consist of adding a right turn lane in the westbound direction on Atlanta Highway and in the northbound direction of Ed Hogan Road.

Fulton 2001
7392 Koch, Christopher P. Kellogg Creek Road Emergency Culvert Repairs

The proposed project consists of the emergency replacement of a existing culvert in southwestern Cherokee County, Georgia (Figure 1). The culvert was damaged during severe rainfall in September 2009. The culvert is located at the Kellogg Creek Road crossing over Owl Creek.

Floyd 1999
7393 Blackwelder, Jon R. Addendum to the Phase I Archaeological Survey of the County Road 50/Caney Bay Road Bridge Over Buffalo Creek, Brantley County, Georgia

The proposed project would replace the bridge on County road (CR) 50/Caney Bay Road over Buffalo Creek in Brantley County. The existing bridge, constructed in 1950, has a sufficiency rating of 13.10 and has load restrictions for trucks; it cannot be repaired cost-effectively.

Brantley 1999