971 Bloom, Jonathan A. Cultural Resources Survey of Oglethorpe Power Corporation's Proposed Doles Substation Site, Worth County, Georgia

This report documents the results of the cultural resources survey of the proposed Doles Substation site, Worth County, Georgia. The field work was carried out by the author and one field technician on January 22, 1991, and continued by the author on January 23, 1991.

Worth County, GA 1991
972 Bloom, Jonathan A. Cultural Resources Survey of the Proposed Elberton Substation Site, Elbert Count, Georgia

This report documents the results of the cultural resources survey of the proposed 250,000 square foot (5.7 acres) Elberton Substation site, Elbert County, Georgia. The field work was conducted by the Principal Investigator and one Senior Field Technician on August 2, 1991.

Elbert County, GA 1991
973 Ruple, Steven D. Phase I Archaeological Survey of the Proposed Site of the Azalea Park 115/25 Kv Substation, Lowndes County, Georgia

This report documents the results of a Phase I archaeological survey investigation conducted to locate and record any cultural resources within the proposed Azalea Park 115/25 kV substation site and access road path south of Valdosta, in Lowndes County, Georgia.

Lowndes County, GA 1991
974 Bloom, Jonathan A. Cultural Resources Survey of the Proposed West Carrollton 115/12kv Substation Site, Carroll County, Georgia

This report documents the results of the cultural resources survey of the proposed 13.81 acre West Carrollton 115/12 kV Substation site, Carroll County, Georgia. The field work was conducted by the author and one field technician on May 13,1991.

Carroll County, GA 1991
975 Wynn, Jack T., Bruce, Rebecca E. Cultural Resources Surveys in Twelve Compartments, Fy90, Brasstown Ranger District, Towns and Union Counties, Georgia

Cultural resources surveys were undertaken on National Forest land in Towns and Union Counties, Georgia, prior to timber sales, road construction, and wildlife openings.

Towns County, GA 1990
976 Price, Thomas Jeffrey A Cultural Resources Survey of the Alamo Transmission Line and Substation, Wheeler County, Georgia

Oglethorpe Power Corporation (OPC) contracted with Southeastern Archeological Services, Inc. to conduct an intensive cultural resources survey of a proposed 3.4 km (2.1 mi) transmission line and 1.5 ha (3.7 ac) substation in Wheeler County.

Wheeler County, GA 1991
977 Gresham, Thomas H. Cultural Resources Survey of the Proposed Dasher Substation, Lowndes County, Georgia

An intensive cultural resources survey was conducted on the proposed 2.4 ha (6 ac) Dasher substation in south central Lowndes County. Surface inspection and twelve shovel tests showed that no archeological sites exist on the tract.

Lowndes County, GA 1990
978 Report Missing

Number Unused.

979 Ruple, Steven D. Phase I Archaeological Survey of the Proposed Boston 69/12 Kv Substation, Thomas County, Georgia

The results of a Phase I archaeological survey of a 9 acre tract of land in Thomas County are documented by this report. The research was conducted by Garrow & Associates, Inc., Atlanta, for Oglethorpe Power Corporation.

Thomas County, GA 1991
980 Wynn, Jack T., Bruce, Rebecca E. Cultural Resources Inventory, Chattooga Ranger District Stephens, Banks, White and Habersham Counties, Georgia 1991

This report is a compilation of various cultural resources surveys and sites that have been recorded since 1983. These surveys have been conducted for timber sales, roads, and wildlife openings on the Chattooga Ranger District, Chattahoochee National Forest.

Banks County, GA 1991