Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8365 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of STP-065-3( 43) , Jackson County

The proposed project consists of the addition of a northbound passing lane on SR 53 just south of the city of Hoschton. The project would begin at MP 6.80 just south of CR 167/Tap Wood Road. The project would end at approximately MP 8.40.

Jackson 2010
8366 Gantt, Mary Elizabeth Cultural Resources Literature Review of the Big Cotton Indian Creek Interceptor, Phase I, 2, and 3 and Phase I Archeological Survey of the Realignment Corridor through Site 9HY3 Henry County, Georgia

In 2001, 2003, and 2006, R. S. Webb and Associates (.RSWA) conducted a literature review of Phases 1, 2, and 3 of the Big Cotton Indian Creek sewer line interceptor in Henry County, Georgia. Research results indicated that one.

Paulding 2010
8367 Webb, Robert S. Addendum to Phase I Cultural Resources Report: 1) Archeological Testing at Sites 9CK1073, 9CK1074 and Stafford Home Place 2) Viewshed Analysis Hickory Log Creek Reservoir Cherokee County, Georgia

This letter addresses issues set forth in review comments provided by you and the Georgia Historic Preservation Division (HPD) on our report entitled: Cultural Resources Survey of the Proposed Hickory Log Creek Reservoir Site, Cherokee County, Georgia, dated January 18, 2000.

Decatur 2014
8368 Webb, Robert S. Edenwood Development Site Paulding County, Georgia

The proposed undertaking is defined as the 121.2 acre [49.1-hectare (ha)] Eden wood residential development site in northeast Paulding County, Georgia which is in the northwest part of the state.

Chatham 2008
8369 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of BHF-052-2(20), Jackson County

The proposed project consists of the widening and replacement of the bridge on SR 15 Alt. over Curry Creek in the city of Jefferson. The project would replace the existing bridge with a 5 barrel culvert.

Macon 2012
8370 Burns, Leigh, Webb, Robert S. Proposed Telecommunications Tower Project Section 106 Field Assessment Milledgeville Tower, 2811 Highway 441 South, Milledgeville, Baldwin County

The proposed undertaking is a 250-foot (lit) monopole lattice-designed telecommunications tower built to accommodate multiple carriers. The tower project area is located at 2811 U.S.

Banks 2009
8371 Lotti, Teresa Ann, Duff, Eric Anthony Archaeological Assessment of Project BHN-002-6(38), Jackson County

Project BHN-002-6(38) would construct two parallel bridges on SR 11/US 129 at Allen Creek in Jackson County. A new 175 foot by 38 foot bridge would be constructed east of the existing bridge to serve the southbound traffic.

Columbia 2012
8372 Garrow, Patrick H., Cleveland, M. Todd Revised Cultural Resource Management Plan for the Rocky Mountain Project, Floyd County, Georgia

The Rocky Mountain cultural resource investigations began in 1972 and have continued to 1997 with preparation of the project cultural resource technical synthesis. The initial cultural resources management plan (CRMP) was completed in 1981 by James J. Shive and amended in 1982.

Cobb 2010
8373 Grover, Jennifer E., Jeanquart, Thomas E., Greer, Brian K. 2001 and 2002 Cultural Resources Surveys of Southern Pine Beetle Damaged Timber Salvage at Fort Stewart, Bryan, Evans, Liberty, Long, and Tatnall Counties, Georgia

In the summer of 2001, Fort Stewart began to experience an infestation of Southern Pine Beetles (SPB) (Dendroctonus frontalis). An outbreak had occurred in the summer of 2000, but the conditions of the summer of 2001 suggested that this year would be much more severe and damaging.

Douglas 2010
8374 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project IM-STP-00MS(199), Jackson/Walton Counties

The proposed project would involve the repainting of the existing bridges at 18 locations in Jackson and Walton Counties. Existing right-of-way varies from bridge to bridge. All construction will be limited to the existing right-of-way.

Hart 2012