Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
1901 Joseph, Joseph W. Phase I Archaeological Survey of Upper Hembree Road Bridge over Foe Killer Creek: Fulton County, Georgia

New South Associates conducted a Phase I archaeological survey of one proposed bridge improvement within Fulton County on December 2, 1998. The existing bridge is 60 feet by 24 feet and the proposed improvements would extend the bridge to 90 feet by 40 feet.

Fulton 1999
1902 Watts, Gordon P. Archaeological Survey of GDOT Proposed Widening of US80/SR26 from Bull River to Lazaretto Creek, Chatham County, Georgia

The Georgia Department of Transportation (GDOT) has proposed a project to widen US 80/SR 26 from just west of Bull River to just east of Lazaretto Creek in Chatham County, Georgia.

Chatham 1999
1903 Price, George D., Elliott, Rita F. Archaeological Survey and Testing for the Proposed State Road 17 Widening GDOT Projects EDS-545 (49) (43) Jefferson, Warren and McDuffie Counties, Georgia

None Present.

Jefferson 1999
1904 Pluckhahn, Thomas J. An Archaeological Survey of Proposed Improvements to Sardis Church Road, Bibb County, Georgia

In late May 1999, Southeastern Archeological Services (SAS) conducted an intensive archeological survey of the proposed widening and new construction associated with improvements to Sardis Church Road, in southern Bibb County.

Bibb 1999
1905 Braley, Chad O. A Phase I Archaeological Survey of the Selected Alternative, Harry S. Truman Parkway, Phases 3, 4, & 5, Chatham County, Georgia

An archeological survey of the selected route of the last segment of the Harry S. Truman Parkway was conducted to ensure that Chatham County is in compliance with federal regulations concerning the disposition of significant archeological sites.

Chatham 1999
1906 Joseph, Joseph W. Phase II Testing of 3 Sites with Stone Piles, South LaGrange Loop, Troup County, Georgia

Test excavations at three closely juxtaposed sites (9Tp9O7, 9Tp9O8, and 9Tp9O9) within the proposed South LaGrange Loop were designed to determine if the associated stone piles are prehistoric and/or historic.

Troup 1999
1907 Joseph, Joseph W. Phase I Archaeological Survey of Bridge Replacement & McIntosh Trail Realignment, Coweta County, Georgia

New South Associates conducted a Phase I archaeological survey of a proposed bridge replacement and realignment of McIntosh Trail (CR 91) in Coweta County on March 10, 1999.

Coweta 1999
1908 Espenshade, Christopher T. Fort Stewart Site Testing D. O. 2: Archaeological Testing at Fort Stewart in Bryan, Evans, Liberty, and Long Counties, Georgia

In June 1998, TRC Garrow Associates, Inc., performed archaeological testing of 11 sites in southeastern Georgia to evaluate their eligibility for the National Register of Historic Places (NRHP).

Bryan 1999
1909 Harrell, Jill Kingham Cultural Resources Survey Report for the Town Creek Compartment 188 Thinning Project

This report covers a cultural resources survey of 94 acres completed in Greene County, Georgia on the Oconee National Forest in Compartment 188, Stand 6. The field survey was conducted by Jill Harrell during January and May 1999.

Greene 1999
1910 Gantt, Mary Elizabeth, Webb, Robert S. Phase I Cultural Resources Survey: Proposed Bear Creek Sewer Line Corridor Douglas County, Georgia

In August 1998, R.S. Webb & Associates conducted a Phase I cultural resources survey of the proposed Bear Creek sewer line corridor along a 6.8-kilometer (4.2 mile) section of Little Bear Creek in Douglas County, Georgia.

Douglas 1999